Plumbing System Design- Yifan Guo

Scored
Your Name
Journal Entry For
Module 10 - Plumbing Systems
ACC Folder Link
ACC Revit File Link
Created
Feb 28, 2024 9:39 AM
Last Edited
Feb 29, 2024 2:56 AM
Created by
Yifan Guo
image

Plumbing System Floor View

image

West Restroom

Top View

image

Section View 1

image

Section View 2

image

East Restroom

Top View

image

Section View 1

image

Section View 2

image

3D View

image

Details:

West Restroom

image

East Restroom

image

Design Challenge:

  1. The circular shape of my building definitely increase the level of difficulties to design the all the plumbing fixture positions and properly arrange the pipings route. In my design, There are fixtures on both side and the women’s and men’s restroom are designed side by side. I initially wanted to use just one sanitary pipe to accommodate all the fixture but later found it impossible to do so. So I added another sanitary pipe just for the fixtures on the other side of the restroom.
image
  1. Took me a while to think about how to place all the fixtures to achieve three goals:
    1. feasible pipe arrangement
    2. no pipe conflict
    3. shortest pipe distance
    4. Creating multiple sections views and combine with 3D views to design helped a lot.

  2. It was also challenging to design while thinking about the Architectural, structural, and mechanical design at the same time to avoid any conflict between the pipe systems and the columns, beams, ducts, etc. I linked all models to the plumbing model while designing the plumbing systems which didn’t eliminate all the conflicts but I am pretty satisfied with the result.