ACC Link
Link to Student
Sun, Chuting
Created
Jan 6, 2025 12:37 AM
Created by
Create a posting that includes:
- A screenshot of an interior view of your merged model from Model Coordination showing the HVAC elements.
- A brief paragraph discussing:
- any challenges that you encountered in this supply duct routing exercise
- whether your proposed design meets the project’s spatial design goals
- any recommendations to make the design more sustainable (and lower the heating and cooling loads)
My difficulty is that the pipes of the two partitions do not overlap each other, since some areas are close together and have little space. At the same time, I need to pay attention to the height of the two different pipes, which requires me to be very careful. I tried to make the pipeline distribution as smooth and concise as possible. When choosing the air terminal, I selected it based on the needs of different functional areas, which improved resource utilization.

