Design Journal Entry - Module 1

Enter (or choose) your name in the Your Name field above.

Then, describe your design inspirations and big feature ideas using text , images, web links, movies... Whatever media works best to express your ideas!

Your Design Journal entries this week should highlight your design thinking and process in modeling:

  • your plumbing system elements
  • your piping systems
  • any special plumbing system challenges that you encountered and how you overcame them

I used standard plumbing system elements, screenshots of which are attached below.

image
image
image

The pipes that I used were of thickness 1” for Domestic Hot Water and Domestic Cold Water, and 4” for sanitary. The slope that I used for sanitary was 1/4” / 12”.

In terms of the placing of the pipes, I created a separate space to accommodate the three types of pipes

image
image
image

My difficulties involved navigating the layout and geometry of a circular system, misunderstandings with the architectural/plumbing model, and for some reason my floors are linked differently, the layout on left of my system shows as one level up, so I had to copy-paste accordingly

image
image
image

I am unable to connect the verticals among themselves, the circularness of the building is constantly causing a routing error and I don’t see why things can’t be connected. I rectified my errors of installing a restroom at the utility room areas by deleting them