Name
Submitted For
Module 9 - Performance-Based Design
Panorama View Link
Images of My Analysis Results
- Option 2: Screenshot showing the ending point of the 4D simulation.
- Option 3: Screenshot showing the building model in the Assemble web interface.
Option 2: 4D Simulation
Option 3: Model-Based Estimating
Link to Summary Report (scroll up to see results)
The total estimated cost is $12.4 million for the structural elements.