Your Name
Baseline Scenario:
Specifications-
- Roof Construction: R38
- Operating Schedule: 12/5
Building Envelope:
Specifications-
- Window Glass - South: Dbl LoE
- Window Glass - North: Dbl LoE
- Western WWR: 0%
- Window Glass - East: Dbl LoE
- Wall Construction: R38 Wood
- Infiltration: 0.17 ACH
Power and Lighting
Specifications-
- Lighting Efficiency: 0.3 W/sf
- Occupancy Controls
- Plug Load Efficiency: 0.6 W/sf
PV Panels
Specifications-
- Panel Efficiency: 20.4%
- Payback Limit: 20 years
- Surface Coverage: 90%