Module 8 - Structural Framing Systems
ACC Folder Link
ACC Revit File Link
Created
Feb 22, 2025 1:23 AM
Last Edited
Mar 8, 2025 8:26 AM
Created by
V
Vlad ClimaFiles & media
Pinterest link
Text
https://pin.it/7idDoFsqa
UPDATED (3/7/2025):
(Adjusted beam center to center spacing a little. Fixed the curved wall framing. See below)

- your overall strategy and the features of the structural system
- Avoid having columns in the middle of open spaces
- Use bays with maximum beam lengths of 30-32 feet and girder lengths of maximum 26-28 feet
- the material and framing system selected
- Structural Steel (ASTM A992) because of the large spans
- wood is also an option
- reinf. concrete could also work if using prestressed concrete for larger spans
- need to keep the number of these larger spans minimal to avoid large costs (expensive to have these many prestressed beams)
- the locations of structural columns and major framing elements
- See above
- any special structural challenges
- The curved facade at the back of the building