During the module practice examples, the most challenging aspect was managing the clashes between the different pipe systems when connecting the plumbing. This required careful design to ensure water could flow efficiently without obstructing other pipes. Overall, the assignment went smoothly, as most of the work involved connecting and coping the various system components. The most difficult part was linking the two floors to a single vertical pipe.