Design Journal Entry - Module 10

Scored
Journal Entry For
Module 10 - Plumbing Systems
ACC Revit File Link
Created
Mar 9, 2025 4:15 AM
Last Edited
Mar 9, 2025 4:30 AM
Created by
Nicholas Michael Dugan
Files & media
Pinterest link

Text

https://pin.it/7idDoFsqa
image

I have two bathrooms in my design. One is on the first floor and one is on the fourth floor. The hard part for me in this design process was to link the pipes together. They never wanted to attach and it made it really hard on me. For my design the cold water pipes are at 4 feet and the hot water is at 4 1/2 feet. The sanitary pipe starts at 0 and slopes down at 1/4inch/ft.