Module 9 - Points to Ponder

Submitted For
Module 9 - Points to Ponder
💡
Please share your comments on 3 of the following Points to Ponder questions. (Choose 3 of the questions below.)

Can you guarantee that the completed building will match the performance predicted by the analysis in its day-to-day operations?

  • Why or why not?

When choosing settings for each of the building performance factors, should you always choose the setting that gives the absolute lowest predicted energy use?

How can you use Insight feedback to make design choices regarding materials, lighting, PV, etc.?

4D simulations are often used to show the construction sequence for an entire project, but shorter simulations that focus on a specific period of time are also useful.

  • Can you provide examples of how a simulation that focuses on a 1 or 2 week period could be useful for planning?

4D simulations that focus on 1 or 2 weeks can help for coordination and planning. When constructing a building it is important to have the equipment in the right area and positions in order to be the most efficient. You are able to work on the building right away rather than worry about if you have all the machinery you need for the next step.

What level of detail should be included in a 4D simulation?

  • Should you include all of the elements in the building model?

I think there should be a lower level of detail included. For a 4D simulation it is more important for things such as the foundation, structural beams and columns, and walls to be included than other details.

How can the feedback shown in a 4D simulation help you to optimize the project schedule?

  • What are the main benefits of linking model elements to the project schedule?

How can model-based quantity takeoff improve the design process?

How can designers improve their designs using the information provided by preliminary estimates of the cost of building their design ideas?

Through information provided designers can create a more efficient building experience. When a change is made to the model it is immediately changed so the information is up to date. This allows for easier budget control and can help stop a project from being shut down due to low funds.