The main goal for my building, not just in this exercise but in general, is to showcase and use nuclear energy to power electrified building systems.

Goal 1: Self-Contained (On-Site) Power Supply

  • Measure:  Building Power Use
  • Targets:
    • Minimally Acceptable Value: On-site generation of 50% of Building Power Use
    • Desired/Target Value: On-site generation of 100% of Building Power Use
  • Strategies:
    • Using a Nuclear SMR to power the building. DOE estimates about 22.5 kWh/sqft power consumption. Rough estimate of our building’s demand is (22.5 x 30,000)/1,000 = 675MWh. Current SMRs can provide about half that, so we would need two.
    • Grid connection optional. Would provide redundancy, but could add unneeded project costs.
    • image

Goal 2: Electrified Building

  • Measure:  Only electric energy used throughout the building (”Electrification”)
  • Targets:
    • Desired/Target Value: 100% of the Building’s power demand through electricity (”Electrification”)
  • Strategies:
    • Using heat pumps throughout the building for cooling and heating loads
    • Using heat pump water heaters for hot/chilled water demand.
    • image
      image

Goal 3: Maximum Daylighting

  • Measure:  Maximum daylight use to light the spaces and reduce heating load
  • Targets:
    • Illuminance - ~ 20 Footcandles (Vertical), 50 Footcandles (Horizontal) (based off general retail targets)
    • Luminance - 25-150 nits (based off typical wall targets)
  • Strategies:
    • Optimizing building orientation
    • Optimizing fenestration to balance daylighting vs cooling demands
    • Using reflective surfaces throughout the interior
    • May depend on site selection