Please enter the following info in the fields above:

  • Your Name (type the first few letter of your name, then select yourself in the list of linked records)
  • Rather than embedding a single link to ACC in the field above, embed the links to each of submission items in the text of your description below.

Images of My Analysis Results

Please paste two screenshots here, based on the options you chose to complete:

  • For Option 1, paste a screenshot of the Benchmark Comparison Graph showing the overall prediction for the energy use given the settings selected.
  • For Option 2, paste a screenshot showing the ending point of your 4D simulation.
  • For Option 3, paste a screenshot showing your building model in the Assemble web interface.

Option 1: Building Performance Analysis

Upload your brief one-page summary of your recommended settings to reach your building performance goal to ACC Docs, then embed a public link here.

Be sure to include your recommendations for the top 10 most important factors (excluding HVAC). For each of the factors:

  • Take a screenshot showing the range of values that you selected to be included in the analysis.
  • Briefly explain (in a sentence or two) why you’ve narrowed the range down to the values selected.
image
image

Explanation in the embedded link!

Option 2: 4D Simulation

Upload the video file showing your 4D simulation to ACC Docs, then embed a public link here.

Option 3: Model-Based Estimating

Upload your summary report presenting your estimate for the major structural elements in your model to ACC Docs, then embed a public link here.

image

In this estimate report, I based my costs on steel structural framing which costs $1800/ton, and concrete which costs either $150/cubic yard or $8/square foot. Of course, these costs are very rough since I did not incorporate potential labor costs or fluctuations in prices of materials based on availability and region.