Module 6 - Points to Ponder

Submitted For
Module 6 - Points to Ponder
💡
Please share your comments on 2 of the following Points to Ponder questions. (Choose 2 of the questions below.)

Should all buildings be modeled first using conceptual masses?

In the case that you are designing a skyscraper or larger building of around 100,000 square feet, then it would be more efficient to model it conceptually before adding design features. It is better to look at the bigger picture before getting more detailed with what each level’s floor plan/layout should look like. For all other cases, such as designing a home or smaller shopping center, then the BIM process can begin at Revit with more intricate designing.

Can you think of any examples of a real building around the world that most likely was created by exploring the form using conceptual mass models?

image

The HARPA Hall and Concert Hall is a perfect example of a multi-story building that was likely designed more conceptually before windows and other more detailed design elements were added.