Journal Entry For
Module 9 - HVAC Systems
The total system load is around 800,000 Btu/h. The cooling load is much larger than the heating load based on the location of the project. My cooling strategy is adding shades to the windows and placing the air terminals near the windows.
1st floor plan view
2nd floor plan view
My HVAC implement challenge is the automatic duct routing. It gave me a hard time to connect the ducts from the second floor to the air handler on the first floor.