Design Journal Entry - Module 11

Scored
Your Name
Agi, Yasemin
Journal Entry For
Module 11 - Power & Lighting Systems
ACC Folder Link
https://acc.autodesk.com/docs/files/projects/cbef7261-4ed5-4dad-99c1-e2a751c74519?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.XUa3LBGqRY2MJRLR-wO_Lw&viewModel=detail&moduleId=folders
ACC Revit File Link
https://acc.autodesk.com/docs/files/projects/cbef7261-4ed5-4dad-99c1-e2a751c74519?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.XUa3LBGqRY2MJRLR-wO_Lw&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AlHrS5NOkRhmi2L95QBaP3g&viewModel=detail&moduleId=folders
Created
Jan 6, 2025 12:34 AM
Last Edited
Jan 6, 2025 12:34 AM
Created by
Glenn Katz

Power System — most of first floor

  • placed outlets on the floor in the lobby area where I imagine the welcome desk is.
image

Lighting System — First Floor

  • Pendant fixtures in exhibition spaces and retail for softer direct indirect lighting.
  • Downlights in restrooms.
  • Troffers in corridors.
  • All switches are dimmer switches (which would in theory be linked to a daylight sensor).
  • Met target illumination in exhibition spaces (30), retail (40), hallways (25), and restrooms (18).
image
image