Workflow
Demo
Practice Exercise (Optional)
Download Practice File: Starting Point
- Duplicate the Palmer Exterior Wall.
- To this new wall type, add a Sill Precast: 8" wide sweep with concrete masonry unit (CMU) material located 1'0" from the base of the wall.
- Change the walls highlighted in the floor plan below to be this new type.
When you have completed this exercise, your model should look like this:
Download File: Ending Point