Link to Student
Journal Entry For
Project 1 - Plan for Iterating
Planning to Iterate
- I learnt about the comfort levels of users when they interact with the garden and turbine space, as they suggested that it should be equivalently spaced to provide a welcoming outdoor garden space for residents to visit
- There were feedbacks about the implementation of the solar panel and rainwater collection triangular pyramid, as they wondered if the solar panel should be placed flat for maximizing energy collection.
- Perhaps the solar panel could be angled for rainwater collection at the bottom of panel, while collecting sunlight for energy generating