Module 5 - Points to Ponder
Please share your comments on 2 of the following Points to Ponder questions. (Choose 2 of the questions below.)
What are the principal advantages of using a single building information model of the existing conditions as the foundation for modeling proposed additions or renovations?
- Why not create a separate model for the new proposed design?
What sort of complexities are introduced when you construct a building complex in phases?
- Materials and structures may not be physically compatible and decisions need to be reversed
- Sketching and outlining constraints and key variables
What are the principal advantages of using a single building information model of the existing conditions as the foundation for modeling several proposed design alternatives for a portion of the building?
- To allow quick comparability between alternatives, within same constraint environment - MEP, architectural, etc
In your project, which features of the proposed design did you choose to model as design alternatives?
- Why did you choose these building features? And what were the biggest challenges in modeling them as the design alternatives?