Instructions

Submitted For
Module 5 - Points to Ponder
💡
Please share your comments on 2 of the following Points to Ponder questions. (Choose 2 of the questions below.)

What are the principal advantages of using a single building information model of the existing conditions as the foundation for modeling proposed additions or renovations?

  • Why not create a separate model for the new proposed design?

What sort of complexities are introduced when you construct a building complex in phases? 

  • What happens at the interfaces between the buildings as the phases advance?
  • How can you plan and prepare for these complexities as you create your initial building model?

What are the principal advantages of using a single building information model of the existing conditions as the foundation for modeling several proposed design alternatives for a portion of the building?

  • Why not create a separate model for each of the design alternatives?

In your project, which features of the proposed design did you choose to model as design alternatives? 

  • Why did you choose these building features?
  • And what were the biggest challenges in modeling them as the design alternatives?