Who
Gabriel Lipkowitz
Submitted For
Module 9 - Performance-Based Design
The above is a view from the Navisworks simulation imported design for the office building, at a North-South cross section, specifically of the structural model.
The Timeline for this building's construction is:
Model based estimate for my high rise office building of the future design:
And finally, a 4D Simulation describing construction of the building can be seen here:
For the cost based estimates, an image of my table: