Project Goals, Targets, & Strategies

Your Name
Daniel Diaz Salgado
Journal Entry For
Module 3 - Project Goals Targets & Strategies
ACC Folder Link
Scored
Created
Jan 22, 2022 9:03 PM
Last Edited
Jan 24, 2022 2:01 AM

Goal 1: Minimize Light Pollution

  • Measure:  Visual assessment
  • Targets:
    • Minimal disruption to the natural diurnal patterns of light and dark.
    • desired / target value
  • Strategies:
    • one design strategy that I’d like to explore in my design to achieve this goal
    • a second design strategy for achieving this goal
    • Goal 2: Site Water conservation and management

    • Measure:  m3 per year of storm water runoff management.
    • Targets:
      • Mitigate the negative environmental effects of storm water runoff.
      • Reduce the outdoor use of potable water on the site.
    • Strategies:
      • Promoting on site percolation by using permeable options such as pavers, porous asphalt, pervious concrete and vegetated landscapes.
      • Reuse storm water for non-potable purposes as irrigation and flushing of toilets.
      • Goal 3: Efficient energy consumption

      • Measure:  kw per year
      • Targets:
        • Reach sustainable development with less impact on environment
      • Strategies:
        • Use of overhangs and awnings.
        • Consider in the design vertical louvers for eastern or western exposures.
        • Take advantage of solar panels.