Submitted By
Srećko Ćurković
Initial Model (EUI 81.3)
Baseline Scenario (EUI 60.2)
- Operating Schedule: 12/5
- Roof Construction: R-38
Building Envelope Best Scenario (EUI 50.9)
- Wall Construction: 14-inch ICF
- WWR (all 4 sides): 40%
- Window Glass (all 4 sides): Trp LoE
- Window Shades (all 4 sides): 2/3 Win Height
Building Envelope + Power & Lighting Best Scenario (EUI 31.4)
- Plug Load Efficiency: 0.6 W/sf
- Lighting Efficiency: 0.3 W/sf
- Daylighting & Occupancy Controls: Occupancy Controls
Building Envelope + Power & Lighting + PV Best Scenario (EUI -10.4)
- Surface Coverage: 90%
- Panel Efficiency: 20.4%
- Payback Limit: 20 yr
Note: In the updated Revit model, I assumed 48” overhangs as 2/3 of typical window height of 72”.