Challenges:

  • greater vertical length to pump fluid → how to reduce this energy loss through design
  • sinks and toilets on opposite sides
  • adding foot wash stations (levels 2-4)
  • greywater system

Things I would include:

  • gravity toilets (kinda already have)
  • digestion/composting tanks in the basement underneath toilets
  • greywater treatment on-site
  • irrigation w grey water

Floor 1 Overview:

  • gender neutral restrooms are located in same place in core on each level
  • modularity aids in design/construction
image
image

Challenges:

  • wanted to have a single wall for all fixtures, would probably go back and change this
  • getting from the mechanical room to the restroom, wasn't able to model but hopefully wouldn’t be too challenging

Strategy/Elements:

  • toilet side: grey water supply, sanitary lines taken to basement/floor 1
  • sink side: hot and cold water lines (preferably from recycled water if included), grey water collection
  • copy first floor elements to other floors and extend central pipes

Section Views

image
image
image

3D Views

image
image
image

To do:

  • clash detection
  • bathroom stalls
  • materials choice
  • side walks
  • railings
  • facade
  • furniture