Module 10 - Plumbing Systems
ACC Folder Link
ACC Revit File Link
Created
Mar 7, 2024 11:34 PM
Last Edited
Mar 8, 2024 6:45 PM
Created by
J
JakeChallenges:
- greater vertical length to pump fluid → how to reduce this energy loss through design
- sinks and toilets on opposite sides
- adding foot wash stations (levels 2-4)
- greywater system
Things I would include:
- gravity toilets (kinda already have)
- digestion/composting tanks in the basement underneath toilets
- greywater treatment on-site
- irrigation w grey water
Floor 1 Overview:
- gender neutral restrooms are located in same place in core on each level
- modularity aids in design/construction
Challenges:
- wanted to have a single wall for all fixtures, would probably go back and change this
- getting from the mechanical room to the restroom, wasn't able to model but hopefully wouldn’t be too challenging
Strategy/Elements:
- toilet side: grey water supply, sanitary lines taken to basement/floor 1
- sink side: hot and cold water lines (preferably from recycled water if included), grey water collection
- copy first floor elements to other floors and extend central pipes
Section Views
3D Views
To do:
- clash detection
- bathroom stalls
- materials choice
- side walks
- railings
- facade
- furniture
- coordination space visual here (arch, struc, mech, plumbing)