Scored
Your Name
Journal Entry For
Module 3 - Project Goals Targets & Strategies
ACC Folder Link
ACC Revit File Link
Created
Jan 21, 2025 3:40 AM
Last Edited
Jan 22, 2025 7:01 AM
Created by
R
RyanFiles & media
Pinterest link
Text
https://pin.it/7idDoFsqa
Goal 1 (Buildable): Efficient Construction
- Measure: Reduced Construction Time
- Targets:
- 10% reduction from standard projection
- 15% reduction from standard projection
- Strategies:
- Tightly maintained schedule led by integrated project delivery team
- Mainly field built or prefab (site dependent)
- Local manufacturers (150 mile radius)
- Weekly site visits by management team or reps
- Clear contracts with subcontractors
Goal 2 (Usable): Maximize Thermal Comfort
- Measure: User Satisfaction
- Targets:
- 65% occupant satisfaction rate
- 80% occupant satisfaction rate
- Strategies:
- Windows
- Shades (manual or sensor)
- Optimize WWR
- Reduce SHGC
- Overhangs
- Large south-facings
- HVAC
- 12-15 ach per person
- 15-18 cfm per person
- Air filtration
- Prioritize natural ventilation
- Allow for tight building (no outside air in extreme cases)
- Sensing thermostats
- Advertised as operable
- Walls
- Small U-factor of exteriors (polystyrene)
- Deciduous trees on E/W
Goal 3 (Operable): Wastewater Treatment
- Measure: Reduce Water Use
- Targets:
- 30% reduction from standard design
- 50% reductions from standard design
- Strategies:
- Wastewater treatment
- Recirculated for irrigation
- Rainwater collection
- Measure: Reduce Water Use
- Targets:
- 30% reduction from standard design
- 50% reductions from standard design
- Strategies:
- Wastewater treatment
- Recirculated for irrigation
- Rainwater collection
Goal 4 (Sustainable): Low Embodied Carbon Materials
- Measure: Proportion of Recycled Concrete
- Targets:
- 15%
- Low target can be subsidized with significant use of (mass) timber
- 25%
- Plus use of (mass) timber
- Strategies:
- Careful dismantling and demolishing of original rock to ensure good quality and avoid material waste
- Use portable crushers at the construction site to reduce cost and pollution