Project Goals

Scored
Your Name
Journal Entry For
Module 3 - Project Goals Targets & Strategies
ACC Folder Link
ACC Revit File Link
Created
Jan 21, 2025 3:40 AM
Last Edited
Jan 22, 2025 7:01 AM
Created by
R
Ryan
Files & media
Pinterest link

Text

https://pin.it/7idDoFsqa

Goal 1 (Buildable): Efficient Construction

  • Measure: Reduced Construction Time
  • Targets:
    • 10% reduction from standard projection
    • 15% reduction from standard projection
  • Strategies:
    • Tightly maintained schedule led by integrated project delivery team
    • Mainly field built or prefab (site dependent)
      • Local manufacturers (150 mile radius)
    • Weekly site visits by management team or reps
    • Clear contracts with subcontractors

Goal 2 (Usable): Maximize Thermal Comfort

  • Measure: User Satisfaction
  • Targets:
    • 65% occupant satisfaction rate
    • 80% occupant satisfaction rate
  • Strategies:
    • Windows
      • Shades (manual or sensor)
      • Optimize WWR
      • Reduce SHGC
      • Overhangs
      • Large south-facings
    • HVAC
      • 12-15 ach per person
      • 15-18 cfm per person
      • Air filtration
        • Prioritize natural ventilation
        • Allow for tight building (no outside air in extreme cases)
      • Sensing thermostats
        • Advertised as operable
    • Walls
      • Small U-factor of exteriors (polystyrene)
      • Deciduous trees on E/W

Goal 3 (Operable): Wastewater Treatment

  • Measure: Reduce Water Use
  • Targets:
    • 30% reduction from standard design
    • 50% reductions from standard design
  • Strategies:
    • Wastewater treatment
      • Recirculated for irrigation
    • Rainwater collection
    • Measure: Reduce Water Use
    • Targets:
      • 30% reduction from standard design
      • 50% reductions from standard design
    • Strategies:
      • Wastewater treatment
        • Recirculated for irrigation
      • Rainwater collection

Goal 4 (Sustainable): Low Embodied Carbon Materials

  • Measure: Proportion of Recycled Concrete
  • Targets:
    • 15%
      • Low target can be subsidized with significant use of (mass) timber
    • 25%
      • Plus use of (mass) timber
  • Strategies:
    • Careful dismantling and demolishing of original rock to ensure good quality and avoid material waste
    • Use portable crushers at the construction site to reduce cost and pollution