Journal Entry For
Module 8 - Structural Framing Systems
For the framing system, I selected both concrete system (only for office area) and steel system (for areas left). The reason I made such selection is that there are huge curtain walls in area other than office, so steel framing system would be the best choice for this part. For the office part, concrete would be the preferred choice.
By now, I haven't finished the whole structure yet because I have some problems about roof. I cannot change the shape of roof now so the framing system between level 2 and level 3 had not been started yet.
For the framing system between level 1 and level 2, I worried that if the steel framing system is feasible in reality.