AnaClare Sole

Created
Mar 9, 2021 7:09 AM
BIM 360 Link

For my model, I had a challenge with the offset height of the piping systems. In my coordination view, it looks like the height of my pipes clash with the ceiling and on Level 1, go below the floor.

image
image