Created
Mar 8, 2021 4:36 AM
One challenge was that the pipes were not an exact mirror, so I copied the sanitary, hot, and cold water lines and flipped them 180 degrees before connecting the rest of the pipes. Another challenge was deleting the excess piping at the top of the model after copying from level 0 to level 1.