Module 9 - Points to Ponder

Submitted For
Module 9 - Points to Ponder
💡
Please share your comments on 3 of the following Points to Ponder questions. (Choose 3 of the questions below.)

Can you guarantee that the completed building will match the performance predicted by the analysis in its day-to-day operations?

  • No, people don’t follow a strict schedule or follow the rules of how long they will use something.

When choosing settings for each of the building performance factors, should you always choose the setting that gives the absolute lowest predicted energy use?

No, while it is good to go lighter, sometimes it is important to use more energy. At a tech company or something that requires a lot of energy, you want to make sure you have the available resources to use.

How can you use Insight feedback to make design choices regarding materials, lighting, PV, etc.?

4D simulations are often used to show the construction sequence for an entire project, but shorter simulations that focus on a specific period of time are also useful.

  • Can you provide examples of how a simulation that focuses on a 1 or 2 week period could be useful for planning?

What level of detail should be included in a 4D simulation?

  • Should you include all of the elements in the building model?

No, not everything should be in there. The main structure is the most important thing. Having the basic building schedule and layout is way more valuable than having furniture and the nitty details.

How can the feedback shown in a 4D simulation help you to optimize the project schedule?

  • What are the main benefits of linking model elements to the project schedule?

How can model-based quantity takeoff improve the design process?

How can designers improve their designs using the information provided by preliminary estimates of the cost of building their design ideas?