Your Name
Created
Jan 3, 2024 10:42 PM
One difficulty I encountered was failing to mirror the piping systems so they matched the fixtures. I had to adjust all the branches one by one, which took a fairly long time. Secondly, I wasn’t sure whether the main vertical pipelines should go up to the roof or end on the second floor. I chose to retain them all the way to the roof. If they should be removed, I will adjust them.
None of the pipes were shown. They are all inside the walls.