Link to Student
Created
Jan 6, 2025 12:37 AM
Created by
Screenshot of Interior View - Merged Model from Coordination View
Brief Paragraph
In this particular exercise my priority was to learn how to connect different types of AHU to to duct. Despite being challenging. I connected the Air Handler in the first level (located in the mechanical room) to bott the supply and return ducts. In the second level I did the same thing, but now with an AHU located in the rooftop. This was really important to me, as we understood in this module that AHU can be located on different places of the building, and rather that standarizing and duplicating HVAC systems as you would in real life (and in my design project!) I wanted to use this opportunity to master different types of connections.