Key Terms
The following key terms were used in this lesson:
Tasks
Activities that appear in the project schedule. These activities can include construction, demolition, or temporary operations.
4D Simulation
A simulation of a construction process that maps model elements to schedule tasks, adding the fourth dimension of time to a 3D model.
Time-based Clash
A clash occurring when two static model elements occupy the same space at a specific time in the project schedule.