Scored
Your Name
Journal Entry For
Module 11 - Power & Lighting Systems
ACC Folder Link
ACC Revit File Link
Created
Jan 6, 2025 12:34 AM
Last Edited
Jan 6, 2025 12:34 AM
Created by
Your Design Journal entries this week should highlight your design thinking and process in modeling:
- your power system elements
- your lighting system elements
Power System - second floor except restrooms and mechanical rooms
- Two panels are placed for this floor, one is at the exhibition area (down right) and one is at the office area (left).
Lighting System - also second floor
- Ceiling is placed at 10 fts above the ground
- Lights used:
- Troffer Lights (used at most places)
- Wall Lights (some in the office areas)
Space Schedule
3D Rendering
- Exhibition + Corridor
- Classroom
- Office