Working with Spaces
‣
Copying Spaces from a Linked Model
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Copy the spaces from the linked model with all the instance parameters.
Place each host space back at its linked counterpart’s location point, then set Upper Limit to match. | 🟣 |
‣
Verifying the Spaces
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Verify my spaces are ready for load calculations | 🟣 |
‣
Setting Space Properties
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Select all spaces on Level 1 named Classroom and set their Space Type to Classroom/Lecture/Training | 🔵 🟣 |
Select all spaces on Level 1 named Classroom and set their Condition Type to Headed and Cooled | 🔵 🟣 |
Select all spaces on Level 1 with Area greater than 1500 SF and set their Space Type to Classroom/Lecture/Training | 🔵 🟣 |
‣
Creating a Space Schedule
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Create a Space Schedule for Level 1 showing all spaces with their Area, Volume, Space Type, and Condition Type | 🔵 🟣 |
Modeling Systems
‣
Creating a VAV System - Office Space
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a single duct VAV system to the offices and conference rooms in this office layout.
VAV Units:
• Place a VAV unit in the ceiling plenum above the three offices on the south side of the building that provides supply air to register in each office.
• Place a VAV unit in the ceiling plenum above the two offices on the north side of the building that provides supply air to register in each office.
• Place a VAV unit in the ceiling plenum above the conference room on the south side of the building that provides supply air to two registers in the room.
• Place a VAV unit in the ceiling plenum above the conference room on the north side of the building that provides supply air to two registers in the room.
• Place a VAV unit at 11’ above the floor level in the open office space at the center of the building that provides supply air to four duct-mounted registers evenly spaced above the open office area.
Air Sources:
• Route supply ducts from the VAV units to an air handler unit in the mechanical room at the northeast corner of the layout.
• Route return air ducts from each room to the air handler unit. | 🟣 |
‣
Creating a VAV System - Retail Space
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a single-duct VAV system to the rooms in this retail space layout.
VAV Unit 1:
• Place a VAV unit at 15’ over the workroom space on the north side of the unit.
• This first VAV unit will supply air to 3 supply registers at 12’ above the workroom floor and one supply register in the office space and the storage space.
• Provide a return air register in the office space and the storage space.
VAV Unit 2:
• Place a second VAV unit at 15’ above the retail space on the south side of the unit.
• This second VAV unit will supply air to 6 supply registers at 12’ above the retail floor.
• Provide a single return air register for the retail space.
Air Sources:
• Route supply ducts from the VAV units to an air handler unit in the mechanical room at the northeast corner of the layout.
• Route return air ducts from each room to the air handler unit.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Creating a WSHP System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a WSHP system to the offices and conference rooms in this office layout.
WSHP Units:
• Place a WSHP unit in the ceiling plenum above the three offices on the south side of the building that provides supply air to register in each office.
• Place a WSHP unit in the ceiling plenum above the two offices on the north side of the building that provides supply air to register in each office.
• Place a WSHP unit in the ceiling plenum above the conference room on the south side of the building that provides supply air to two registers in the room.
• Place a WSHP unit in the ceiling plenum above the conference room on the north side of the building that provides supply air to two registers in the room.
• Place a WSHP unit at 11’ above the floor level in the open office space at the center of the building that provides supply air to four duct-mounted registers evenly spaced above the open office area.
Air & Water Sources:
• Route supply ducts from the VAV units to an air handler unit in the mechanical room at the northeast corner of the layout.
• Route return air ducts from each room to the air handler unit.
• Route the hot and cold water piping to a boiler and a chilled water unit in the same mechanical room.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Creating a Ductless Mini-Split System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a ductless mini-split HVAC system to this residential apartment unit.
Cassettes:
• Place wall-mounted cassettes in the bedroom and living area on the central wall between the rooms.
Outdoor Unit:
• Place the outdoor condenser unit on the balcony to the far right side and model the refrigerant piping from the unit to the fan coil. | 🟣 |
‣
Creating a Ducted Mini-Split System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a ducted mini-split HVAC system to this residential apartment unit.
Fan Coil:
• Place the concealed duct fan coil unit in the space above the ceiling over the closet
Registers:
• Place a ceiling-mounted supply register in the center of the bathroom.
• Place a ceiling-mounted supply register in the center of the kitchen.
• Place a wall-mounted supply register at 10' high in the soffit wall between the closet and the bedroom.
• Place a wall-mounted supply register at 10' high in the soffit wall between the kitchen and living areas.
• Place a return register in the ceiling over the entry.
Ducts:
• Route supply ducts from the fan coil unit to the four supply registers.
• Route a return duct to the return register.
Outdoor Unit:
• Place the outdoor condenser unit on the balcony to the far right side and model the refrigerant piping from the unit to the fan coil. | 🟣 |
‣
Creating a Chilled Beam System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add an active chilled beam system to the offices and conference rooms in this office layout.
Chilled Beams:
• Place ceiling-mounted chilled beams at 10’ above the floor level in the offices and conference rooms.
• Place 1 chilled beam and a return air intake in each office.
• Place 2 chilled beams and a return air intake in each conference room.
Water & Air Sources:
• Route the air supply ducts and return air ducts to an air handler unit in the mechanical room at the northeast corner of the layout.
• Route the hot and cold water piping to a boiler and a chilled water unit in the same mechanical room. | 🟣 |
‣
Creating a Hot Water Radiator System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a hot water radiator system to this residential apartment unit.
Radiators:
• Place wall-mounted radiators along the exterior wall of the bedroom and living areas.
Hot Water Source:
• Route the piping to a water heater in a mechanical room out of view. | 🟣 |
‣
Creating a Radiant Floor System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a hot water radiant floor system to this residential apartment unit.
In-Floor Tubing:
• Provide three zones with thermostats in each room:
◦ Living Area
◦ Bedroom Area
◦ Bathroom
Hot Water Source:
• Route the tubing to a water heater in a mechanical room out of view. | 🟣 |