Add a single-duct VAV system to the rooms in this retail space layout.
VAV Unit 1:
- Place a VAV unit at 15’ over the workroom space on the north side of the unit.
- This first VAV unit will supply air to 3 supply registers at 12’ above the workroom floor and one supply register in the office space and the storage space.
- Provide a return air register in the office space and the storage space.
VAV Unit 2:
- Place a second VAV unit at 15’ above the retail space on the south side of the unit.
- This second VAV unit will supply air to 6 supply registers at 12’ above the retail floor.
- Provide a single return air register for the retail space.
- Route supply ducts from the VAV units to an air handler unit in the mechanical room at the northeast corner of the layout.
- Route return air ducts from each room to the air handler unit.
Air Sources:
As you work, send me a message after each step saying what you did and what you found.
Add a piping systems to the bathrooms and kitchen in this multi-story apartment building.
Bathrooms:
- Run copper cold water supply lines to the lavatory sink, toilet, and shower.
- Run copper hot water supply lines to the lavatory sink and shower.
- Run sanitary drain lines from all three fixtures to a single drainage stack in the bathroom riser space.
- Run vent piping from all three fixtures to a single vent stack in the bathroom riser space.
- Repeat this piping design on Levels L1 though L3.
Bathroom Riser:
- A bathroom riser space is provided behind the toilet and shower.
- Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Kitchens:
- Run a copper cold water supply line to the kitchen sink.
- Run copper hot water supply lines to the kitchen sink and dishwasher.
- Run sanitary drain lines from the kitchen sink and dishwasher to a single drainage stack in the kitchen riser space.
- Run vent piping from both fixtures to a single vent stack in the kitchen riser space.
- Repeat this piping design on Levels L1 though L3.
Bathroom Riser:
- A kitchen riser space is provided at the north end of the closet at the left side of the kitchen.
- Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
- Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 10’ above the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found.
Add a piping systems to the single-user restrooms in this multi-story office building.
Bathrooms:
- Run copper cold water supply lines to the lavatory sink and toilet.
- Run copper hot water supply lines to the lavatory sink.
- Run sanitary drain lines and vent piping from all fixtures to a single drainage and vent stack in the bathroom riser space.
- Repeat this piping design on Levels L1 though L3.
Bathroom Riser & Piping Space:
- A bathroom riser and piping space is provided between the restrooms.
- Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
- Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 20’ east of the riser locations at 10’ the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found.
Add a piping systems to the bathrooms and kitchen in this multi-story apartment building.
Bathrooms:
- Run copper cold water supply lines to the lavatory sink, toilet, and shower.
- Run copper hot water supply lines to the lavatory sink and shower.
- Run sanitary drain lines from all three fixtures to a single drainage stack in the bathroom riser space.
- Run vent piping from all three fixtures to a single vent stack in the bathroom riser space.
- Repeat this piping design on Levels L1 though L3.
Bathroom Riser:
- A bathroom riser space is provided behind the toilet and shower.
- Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Kitchens:
- Run a copper cold water supply line to the kitchen sink.
- Run copper hot water supply lines to the kitchen sink and dishwasher.
- Run sanitary drain lines from the kitchen sink and dishwasher to a single drainage stack in the kitchen riser space.
- Run vent piping from both fixtures to a single vent stack in the kitchen riser space.
- Repeat this piping design on Levels L1 though L3.
Bathroom Riser:
- A kitchen riser space is provided at the north end of the closet at the left side of the kitchen.
- Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
- Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 10’ above the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found.
Add a fire protection sprinkler system to the apartments in this multi-story residential building.
Fire Protection Sprinklers & Supply Lines:
- Place ceiling-mounted fire protection sprinklers at 10’ above the floor level in each unit, following all relevant code requirements for spacing and type.
- Route the supply piping for these sprinklers from each unit to a supply trunk line at the south side of the hallway.
- Run the horizontal trunk supply line the full length of the hallway.
- Connect the horizontal trunk lines at each level to a riser in the mechanical room at each level.
- Repeat this piping design on Levels L1 through L3.
Garage Level Connections:
- Run a horizontal trunk line at 10’ above the Level Garage floor level that connects the base of the vertical riser for the piping system to an external Fire Department Connection at the front of the exterior wall at the garage level.
As you work, send me a message after each step saying what you did and what you found.