Modeling Systems
‣
Creating Plumbing Systems for Stacked Single-User Restrooms
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a piping systems to the single-user restrooms in this multi-story office building.
Bathrooms:
• Run copper cold water supply lines to the lavatory sink and toilet.
• Run copper hot water supply lines to the lavatory sink.
• Run sanitary drain lines and vent piping from all fixtures to a single drainage and vent stack in the bathroom riser space.
• Repeat this piping design on Levels L1 though L3.
Bathroom Riser & Piping Space:
• A bathroom riser and piping space is provided between the restrooms.
• Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
• Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 20’ east of the riser locations at 10’ the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Creating Plumbing Systems for Stacked Multi-User Restrooms
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a piping systems to the multi-user restrooms in this multi-story office building.
Bathrooms:
• Run copper cold water supply lines to the lavatory sinks, toilets, and urinals.
• Run copper hot water supply lines to the lavatory sinks.
• Run sanitary drain lines and vent piping from all fixtures to a single drainage and vent stack in the bathroom riser space.
• Repeat this piping design on Levels L1 though L3.
Bathroom Riser & Piping Space:
• A bathroom riser and piping space is provided between the restrooms.
• Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
• Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 20’ east of the riser locations at 10’ the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Creating Plumbing Systems for Stacked Residential Units
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add piping systems to the bathrooms and kitchen in this multi-story apartment building.
Bathrooms:
• Run copper cold water supply lines to the lavatory sink, toilet, and shower.
• Run copper hot water supply lines to the lavatory sink and shower.
• Run sanitary drain lines from all three fixtures to a single drainage stack in the bathroom riser space.
• Run vent piping from all three fixtures to a single vent stack in the bathroom riser space.
• Repeat this piping design on Levels L1 though L3.
Bathroom Riser:
• A bathroom riser space is provided behind the toilet and shower.
• Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Kitchens:
• Run a copper cold water supply line to the kitchen sink.
• Run copper hot water supply lines to the kitchen sink and dishwasher.
• Run sanitary drain lines from the kitchen sink and dishwasher to a single drainage stack in the kitchen riser space.
• Run vent piping from both fixtures to a single vent stack in the kitchen riser space.
• Repeat this piping design on Levels L1 through L3.
Kitchen Riser:
• A kitchen riser space is provided at the north end of the closet at the left side of the kitchen.
• Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
• Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 10’ above the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Converting a Multi-User Restroom to Use Greywater
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Modify this plumbing system design to capture greywater from the lavatory sinks and use it supply greywater to the toilets and urinals. | 🟣 |
‣
Creating a Fire Sprinkler System for Stacked Residential Units
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a fire protection sprinkler system to the apartments in this multi-story residential building.
Fire Protection Sprinklers & Supply Lines:
• Place ceiling-mounted fire protection sprinklers at 10’ above the floor level in each unit, following all relevant code requirements for spacing and type.
• Route the supply piping for these sprinklers from each unit to a supply trunk line at the south side of the hallway.
• Run the horizontal trunk supply line the full length of the hallway.
• Connect the horizontal trunk lines at each level to a riser in the mechanical room at each level.
• Repeat this piping design on Levels L1 through L3.
Garage Level Connections:
• Run a horizontal trunk line at 10’ above the Level Garage floor level that connects the base of the vertical riser for the piping system to an external Fire Department Connection at the front of the exterior wall at the garage level.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Creating a WSHP System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a WSHP system to the offices and conference rooms in this office layout.
WSHP Units:
• Place a WSHP unit in the ceiling plenum above the three offices on the south side of the building that provides supply air to register in each office.
• Place a WSHP unit in the ceiling plenum above the two offices on the north side of the building that provides supply air to register in each office.
• Place a WSHP unit in the ceiling plenum above the conference room on the south side of the building that provides supply air to two registers in the room.
• Place a WSHP unit in the ceiling plenum above the conference room on the north side of the building that provides supply air to two registers in the room.
• Place a WSHP unit at 11’ above the floor level in the open office space at the center of the building that provides supply air to four duct-mounted registers evenly spaced above the open office area.
Air & Water Sources:
• Route supply ducts from the VAV units to an air handler unit in the mechanical room at the northeast corner of the layout.
• Route return air ducts from each room to the air handler unit.
• Route the hot and cold water piping to a boiler and a chilled water unit in the same mechanical room.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
‣
Creating a Hot Water Radiator System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a hot water radiator system to this residential apartment unit.
Radiators:
• Place wall-mounted radiators along the exterior wall of the bedroom and living areas.
Hot Water Source:
• Route the piping to a water heater in a mechanical room out of view. | 🟣 |
‣
Creating a Ductless Mini-Split System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a ductless mini-split HVAC system to this residential apartment unit.
Cassettes:
• Place wall-mounted cassettes in the bedroom and living area on the central wall between the rooms.
Outdoor Unit:
• Place the outdoor condenser unit on the balcony to the far right side and model the refrigerant piping from the unit to the fan coil. | 🟣 |
‣
Creating a Ducted Mini-Split System
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a ducted mini-split HVAC system to this residential apartment unit.
Fan Coil:
• Place the concealed duct fan coil unit in the space above the ceiling over the closet
Registers:
• Place a ceiling-mounted supply register in the center of the bathroom.
• Place a ceiling-mounted supply register in the center of the kitchen.
• Place a wall-mounted supply register at 10' high in the soffit wall between the closet and the bedroom.
• Place a wall-mounted supply register at 10' high in the soffit wall between the kitchen and living areas.
• Place a return register in the ceiling over the entry.
Ducts:
• Route supply ducts from the fan coil unit to the four supply registers.
• Route a return duct to the return register.
Outdoor Unit:
• Place the outdoor condenser unit on the balcony to the far right side and model the refrigerant piping from the unit to the fan coil. | 🟣 |