Example - Piping Systems for Stacked Single-User Restrooms



Note: The sanitary, vent, hot domestic water, and cold domestic water lines would connect to sources and terminals (for example, the sanitary sewer connection) at the Garage level.
You can download this model file here:
AI Prompts
Creating Plumbing Systems for Stacked Single-User Restrooms
Prompt | Tool Options
🟢 = Autodesk Asst
🔵 = Revit MCP
🟣 = Python + Dynamo |
Add a piping systems to the single-user restrooms in this multi-story office building.
Bathrooms:
• Run copper cold water supply lines to the lavatory sink and toilet.
• Run copper hot water supply lines to the lavatory sink.
• Run sanitary drain lines and vent piping from all fixtures to a single drainage and vent stack in the bathroom riser space.
• Repeat this piping design on Levels L1 though L3.
Bathroom Riser & Piping Space:
• A bathroom riser and piping space is provided between the restrooms.
• Route the cold water, hot water, drainage, and vent lines through vertical risers that extend from the garage level (below L1) to the roof (level L4).
Garage Level Connections:
• Run horizontal trunk lines that connect the base of the vertical risers for each piping system at 20’ east of the riser locations at 10’ the Level Garage floor level.
As you work, send me a message after each step saying what you did and what you found. | 🟣 |
Claude Response
Step 1 – Connected to the model. Revit is open on 261105 Piping Systems for Stacked Single-User RR. Levels: Garage (−12'), L1 (0'), L2 (12'), L3 (24'), L4/roof (36'). The model has 12 plumbing fixtures, 78 walls and 3 floors, with no existing piping and no warnings. Next I'll inventory the fixtures, their connectors, and the riser space between the restrooms.
Revit 2026 uses ElementId.Value; adjusting.
Step 2 – Surveyed fixtures, chase and pipe types.
- Fixtures (same layout on L1–L3): each floor has two back-to-back restrooms sharing a plumbing wall. Per floor: 2 wall-hung flush-valve water closets (4" drain, 1" CW) at the north end and 2 wall-hung lavatories (1¼" drain, ½" CW + ½" HW) at the south end. Lavatories are mirrored, so CW/HW sides swap between rooms.
- Riser/piping space: the chase between the two 4½" partitions is only about 8" clear (x ≈ 10.42'–11.08') and runs about 7.5' north–south up to the exterior wall. That's tight for a 4" stack plus three other risers. I've laid things out so no horizontal branch has to pass a 4" stack: sanitary stack at the south end, vent stack at the north end, and CW/HW risers in side "lanes" near the north end.
- Pipe types: the model has PVC – DWV (sanitary tees, bends, reducers), which I'll use for sanitary and vent. The only copper type is Standard (Copper K with welded steel-style fittings), so I'll create a Copper – Type L pipe type with generic fittings for CW/HW.
- No fixtures have vent connectors, so each fixture vent will tap its drain branch inside the chase.
Next: create the copper pipe type, then the four risers (Garage +10' up to L4) and the garage trunks.
Step 3 – Copper pipe type, risers and garage trunks created.
- Created pipe type Copper – Type L (Copper L segment, generic elbows/tees/transitions).
- Placed four vertical risers in the chase, each running from Garage + 10'-0" (EL −2'-0") up to L4 (EL 36'-0"):
- Sanitary stack – 4" PVC DWV, at the south end of the chase.
- Vent stack – 3" PVC DWV, at the north end, against the exterior wall.
- Domestic cold water – 2" copper, west side of the chase near the north end.
- Domestic hot water – ¾" copper, east side of the chase near the north end.
- Each riser base turns 90° with an elbow into a horizontal trunk running 20'-0" east at Garage +10'. All four elbows placed cleanly.
- I split the risers at each floor's branch elevation so the branch tees can drop in next. Tee heights: sanitary at L+0'-9¼" (WCs) and L+1'-9" (lavs), CW at L+3'-0", HW at L+3'-4", vent at L+3'-9".
Note: 20' east puts the trunk ends about 9.5' past the building's east face (x ≈ 21'). I followed your spec, but those ends will need to be connected to whatever main or exterior service they're meant to reach.
Next: build the L1 restroom branches and test the fittings before repeating on L2 and L3.
Step 4 – L1 restroom piping complete (all 29 fittings connected, 0 failures).
What's on L1 now:
- Sanitary (PVC DWV): the two back-to-back WCs join at a 4" sanitary tee in the chase, then run 4" south to the stack. The two lavatories drop 1¼" tailpieces, transition to 2", and their arms meet at a tee in the chase before running 2" to the stack. There are separate stack tees for the WC branch (L+0'-9¼") and the lav branch (L+1'-9").
- Vent (PVC DWV): a 2" vent rises from the lav drain branch and another from the WC drain branch. They combine in a 2" horizontal at L+3'-9" (above the lav flood rims) and tee into the 3" vent stack.
- Cold water (Copper L): a 1" branch off the 2" CW riser at L+3'-0" feeds both flush valves through a drop and tee. ½" branches feed both lavatories, with a 1"×½" transition near the end of the run.
- Hot water (Copper L): a ¾" branch off the HW riser at L+3'-4" feeds both lavatories at ½", with a ¾"×½" transition.
Issues I hit and fixed:
- The fixture connectors sit at fractional positions (e.g. 10.0417', 51.8333'). My first pass used rounded coordinates, which skewed several pipes by a few thousandths of a foot, so Revit rejected those fittings. I rebuilt everything from the exact connector locations.
- The WC vent tap was too close to the 4" WC header tee for both fittings to fit. I moved the tap about 1.8' south.
- Deleting the first pass left trimmed gaps in the risers, so I restored the riser segments before re-teeing.
Design notes:
- Horizontal drains are modeled flat (no slope) so the tees seat reliably. Apply ¼"/ft slope with Revit's slope tool before documentation.
- The 8" chase only fits all four risers in narrow lanes. Clearances between some pipes are under ½", so I'd flag the chase width for coordination.
Next: repeat the same layout on L2 and L3.
The last call timed out; the script only fills a gap where exactly two open ends exist, so re-running it is safe.
All three floors are piped and everything is connected. There are 4 systems and no model warnings. The model is not saved yet, so save it when you're happy, or tell me to.
What's in the model
- Risers: all four run in the chase between the restrooms, from Garage +10'-0" (EL −2') up to L4 (EL 36'):
- 4" PVC sanitary stack
- 3" PVC vent stack
- " Copper L cold water
- ¾" Copper L hot water
- Each floor (L1–L3):
- Both WCs and both lavatories drain to the sanitary stack.
- Each fixture group is vented to the vent stack, with the vent header at L+3'-9", above the lav rims.
- CW feeds both flush valves and both lavs.
- HW feeds both lavs.
- Garage: each riser turns at its base into a trunk running 20'-0" east at Garage +10'.
- Pipe types: I created a new Copper – Type L pipe type for the water lines. Sanitary and vent use the existing PVC – DWV type.
- Final check:
- All 48 fixture connectors are connected.
- The only open ends are the 4 riser tops at L4 and the 4 trunk ends.
- Systems: Sanitary (12 fixtures), Cold Water (12), Hot Water (6 lavs), Vent.
- Everything I added has the comment "RR-Plumbing", so you can filter or select it.
What changed from the original layout
- Sanitary stack moved: a short gap in the lav drain line wouldn't close on any floor, so I shifted the sanitary stack ¾" south and moved the lav vent taps slightly north.
- Systems merged: the CW and HW lines had split into ten separate systems in Revit. I merged them into one system each.
Things to review
- Slope: horizontal drains are modeled flat so the fittings would seat. Apply ¼"/ft slope before documentation.
- Chase width: the chase is only about 8" clear. Some clearances between pipes are under ½", which is worth raising with the architect.
- Trunk ends: the trunks end about 9.5' outside the building's east face. They'll need to be extended or connected to whatever main they're meant to reach.
- Roof termination: the risers stop at L4 with open ends. Vent and stack terminations above the roof aren't modeled.
- Sizing: pipe sizes are reasonable defaults, not calculated. The vent stack in particular should be confirmed against code.
Claude Spreadsheet Summary of Systems Created
I'll pull the pipe and fitting quantities from the model, then build the summary spreadsheet.
The spreadsheet summary of the four piping systems is in Restroom_Piping_Systems_Summary.xlsx. All totals are formulas calculated from the full pipe and fitting data, which is included on its own tabs.
System | Material | Pipe segments | Fittings | Total length |
Sanitary | PVC Sch 40 DWV | 38 | 37 | 71.2 ft |
Vent | PVC Sch 40 DWV | 17 | 13 | 79.1 ft |
Domestic Cold Water | Copper Type L | 41 | 34 | 81.2 ft |
Domestic Hot Water | Copper Type L | 29 | 25 | 78.2 ft |
Total | 125 | 109 | 309.7 ft |
The other tabs cover:
- Length by Size: length for each system and pipe size, broken out by Garage, L1, L2 and L3.
- Fittings by Level: fitting counts by family for each system and level.
- Risers & Trunks: each riser's location, elevations, branch tee heights and 20' trunk.
- Fixtures: all 12 fixtures and the pipe size at each connection.
- Notes: the open items (slope, sizing, chase width, roof terminations, trunk ends).
The Revit connection stopped responding partway through this step. The numbers come from the full export I pulled just before it dropped, so they're complete. The one thing missing is fitting sizes: the size values Revit gave me for copper fittings were wrong, so the fittings tab lists family and level only.