Example 1 - Lowering Footings to Underside of Slab
Clash Group 002
Group | Issue | Struct elems | Arch elems | Recommended action |
G02 | Spread footings project 6" into the architectural slab-on-grade (footing tops at 0'-0") | 32 | 1 | Drop footing top-of-concrete to -0'-6" (underside of SOG) or confirm slab/footing ownership. |

Claude Prompt
Open the MixedUse-Structural model and resolve the clashes in Group G02 using the recommended actions.
As you work, send me a message after each step saying what you did and what you found.
Claude Performs the Requested Changes
I'll start by checking what Revit has open, since the earlier attempt to open the model may have partly run.
Step 1: checked Revit. Revit has "261116 Linking Test" open, and MixedUse-Structural is loaded only as a link inside it, so it can't be edited yet. Next I'll open it as a model you can edit.
The tool can't open a cloud model from its display path. I'll get the model's real cloud address from the link and open it with that.
I have the model's cloud address. Opening it now.
Step 2: opened MixedUse-Structural and checked the G02 elements.
- The model is open, editable and workshared. The footings are on Workset1, and nobody else has them checked out.
- All 32 footings are "Footing-Rectangular 72" x 48" x 18"" on Level 1, with their tops at 0'-0" ("Height Offset From Level" = 0"). That's why they push 6" up into the architect's 6" slab, which runs from 0'-0" down to -0'-6".
- Each of the 32 Level 1 columns sits directly on one of these footings, with its base at 0'-0".
Next I'll make these changes:
- Set every footing's "Height Offset From Level" to 0'-6", so its top meets the underside of the slab. This is the recommended action.
- Set each Level 1 column's Base Offset to 0'-6" at the same time. Otherwise the columns would float 6" above their footings. I'll leave the braces alone.
Step 3: made the changes in MixedUse-Structural.
- Footings: all 32 now have their tops at 0'-6" ("Height Offset From Level" = -0'-6"). They're still 72" x 48" x 18" deep.
- Level 1 columns: all 32 now have a Base Offset of 0'-6". Each one bears on the top of its footing, with no gaps.
- Warnings: the model has 109 warnings. 77 say elements will be detached from their associated plane, and 32 say analytical elements became invalid during the upgrade process. The 32 upgrade warnings mention the footings and columns, but they come from the model being upgraded to this Revit version, not from today's edit. I'd still have the structural engineer check the analytical model.
Next I'll re-run the clash check for these elements against the architect's slab-on-grade.
Claude Reports Clashes Resolved and New Issues to Verify
Step 4: re-checked the clashes. G02 is resolved.
- Footings vs the architect's slab-on-grade: 0 clashes, down from 32 and 325 ft³ of overlap. The footing tops now meet the underside of the slab exactly.
- New, expected condition: the 32 Level 1 columns now pass through the 6" slab to reach their footings. That's about 0.18 ft³ per column, the steel section through the slab depth. This is normal on site: the slab is poured around each column with an isolation joint. The architect may want to show blockouts at the columns, and it will appear as a minor item next time the full clash check runs.
Not done yet: the changes are only in your open copy. Your teammates and the linked model in "261116 Linking Test" won't see them until you sync with central.
Step 5: synced with central. MixedUse-Structural is synced, with the comment "G02 clash fix: footings lowered to -0'-6"…", and all borrowed elements were given back. It has no unsaved changes, and it's still open in Revit.
"261116 Linking Test" still shows the old version of the structural link. To see the fix there, close MixedUse-Structural, then reload the link (Manage → Manage Links → Reload). Until then, the 32 magenta G02 markers and the "CLASH REVIEW - G02" view still show the old clashes.
The 32 G02 clashes are fixed in MixedUse-Structural and synced to central. I re-ran the check on these elements, and the footings no longer overlap the architect's slab-on-grade.
- Footings: I set all 32 footing tops to -0'-6" (Height Offset From Level), the recommended action. They now meet the underside of the slab-on-grade.
- Columns: I also lowered the 32 Level 1 column bases by 6" so they still sit on their footings. This went beyond the recommended action; without it each column would stop 6" above its footing.
- New, expected condition: those columns now pass through the 6" slab, which is normal. The architect may want to show blockouts at the columns.
- Warnings: 32 warnings about invalid analytical elements mention the footings and columns. They're from the model being upgraded to this Revit version, not from this edit, but the structural engineer should still check the analytical model.
"261116 Linking Test" still shows the old structural model, along with the G02 markers and view. Close MixedUse-Structural there and reload the link (Manage → Manage Links → Reload) to see the fix.
Once the link is reloaded, I can re-run the full clash check, clear the old G02 markers and update the spreadsheet.
Example 2 - Moving Braces to Avoid Facade Glazing Conflicts (Where Possible)
Clash Group G04
Group | Issue | Struct elems | Arch elems | Recommended action |
G04 | HSS6x6 braces at Level 1 cut through storefront glazing, mullions and EIFS walls | 8 | 60 | Relocate braced bays to solid wall zones or revise façade layout at braced frames. |

Claude Prompt
Open the MixedUse-Structural model and resolve the clashes in Group G04 using the recommended action 1 - Relocate braced bays to solid wall zones.
As you work, send me a message after each step saying what you did and what you found.
Claude Explores Options and Their Impacts
I'll start by checking that MixedUse-Structural is still open and editable, then look at the 8 HSS braces and the façade around them.
Step 1: checked Revit. MixedUse-Structural was no longer open as an editable model, only as a link in "261116 Linking Test". It looks like it was closed after the G02 fix. Next I'll open it again.
Step 2: opened MixedUse-Structural and looked at the bracing.
- The model is open and editable, and the G02 footing fix from earlier is in place.
- The lateral system is 6 chevron braced frames made of HSS6x6x.500, each running up all 3 storeys. That's 36 braces in all. The frames are on:
- Grid 1: bays B–C and F–G
- Grid 4: bays B–C and F–G
- Grid A: bay 2–3
- Grid H: bay 2–3
- The 8 clashing braces (G04) are all on Level 1, in the frames on Grid 4 (B–C and F–G), Grid A (2–3) and Grid H (2–3). The two Grid 1 frames don't clash.
Moving only the Level 1 braces would break the vertical load path, so I'll move each affected frame as a full 3-storey stack. Next I'll map every bay on Grids 4, A and H to find the ones where the façade is solid at all 3 levels.
Step 3: mapped the façade bay by bay. Action 1 can only partly be done.
For each bay on Grids 4, A and H, I checked whether the architect's façade is solid wall or has glazing at each level:
- Grid 4: every 20 ft bay has storefront glazing at Level 1. Only bay D–E (30 ft wide) is solid EIFS wall at all 3 levels. That's room for one braced frame, but this grid has two. A chevron brace in a 30 ft bay also needs new geometry, not just a move.
- Grids A and H: no bay is solid. All three bays on each grid have storefront at Level 1. There's nowhere on these grids to move the braced bays to.
- Possible interior option: the stair/elevator core inside bay D–E has full-height solid walls with no openings. One runs east–west along about Grid 2, and one runs north–south at x ≈ 13'-4". Bracing could go there, but it would need new columns, because no grid columns line up with those walls.
Each of these options changes the building's lateral system: fewer or relocated frames, different bay geometry, or new columns. That's a decision for the structural engineer of record, so I haven't changed anything in the model. I need you to choose how to proceed.
Claude Explains a Problem and Asks How to Proceed

Claude Performs the Requested Changes
You chose to combine the two Grid 4 frames into one in bay D–E. Before I edit, I'll confirm there are columns at D and E and a beam over the bay at each level for the braces to meet.
Columns at D4 and E4 run the full height, and there's a W21X55 beam over D–E at every level, so the new frame has supports. I'll make the change now.
The script stopped before making any changes because of an element ID format issue. I'll fix that and run it again.
Revit flagged all 6 new braces as "slightly off axis", because I used rounded grid coordinates. I'll snap their ends to the exact column centres and the beam midpoint.
Step 4: moved the Grid 4 bracing into bay D–E.
- Checked first: the columns at D4 and E4 run all 3 storeys, and a W21X55 beam spans D–E at Levels 2, 3 and Roof, so the new chevron has supports.
- Added: one 3-storey chevron frame in bay D–E, made of 6 HSS6x6x.500 braces. I copied them from the existing braces, so they keep the same type and settings, and set their ends at the D4/E4 columns and the beam midpoint. Each brace is now 18.4 ft long, compared with 14.7 ft before, because the bay is 30 ft wide instead of 20 ft.
- Removed: the two Grid 4 frames in bays B–C and F–G, 12 braces in total.
- Warnings: the new braces at first gave 6 "slightly off axis" warnings, because I'd used rounded grid coordinates. I snapped them to the exact column and beam positions, and those warnings cleared. The model is back to 109 warnings, all ones that were there before.
- Not touched: the Grid A and Grid H frames (2–3), as you chose.
Next I'll re-check Grid 4 against the façade.
Step 5: re-checked all the braces against the architect's façade.
- Grid 4: the bracing no longer hits any glazing. The 32 G04 clashes on this grid (storefront glass, mullions and EIFS at Level 1) are gone.
- Expected: at Level 1, the new D–E braces sit inside the solid EIFS wall, which is what you want.
- New, minor: at Levels 2 and 3, each new brace crosses the end of a 4⅞" 1-hr partition where it meets the outside wall, 2 places per level. The architect needs to detail how those partitions stop at the brace.
- Grids A and H: unchanged, as you chose. Their 32 G04 clashes are still there: storefront glass and mullions at Level 1, plus one storefront wall hit per grid at Level 2.
Claude Flags New Issues Created and Items Needing Engineer Review
Before this goes further: the new frame changes the lateral system. The braces are longer and flatter, and Grid 4 now has one frame instead of two. The W21X55 beams in bay D–E now take the chevron's point load at mid-span. The structural engineer needs to check this before it's built.
Nothing has been synced yet.
Step 6: synced with central. MixedUse-Structural is synced and all borrowed elements were given back. The sync comment says the change is pending structural engineer review and that Grids A and H are unchanged. The model is still open in Revit. To see the change in "261116 Linking Test", close it there and reload the structural link.
The Grid 4 part of G04 is fixed and synced to central. Grids A and H can't be fixed this way, because neither grid has a bay that's solid wall at all three levels.
- Grid 4: I replaced the two chevron braced frames in bays B–C and F–G with one 3-storey frame in bay D–E. That's the only bay on Grid 4 where the façade is solid at every level. A re-check found no clashes with glazing on this grid, which clears 32 of the 64 G04 clashes.
- New, minor: at Levels 2 and 3, each new brace crosses the end of a 1-hr partition where it meets the outside wall. The architect needs to detail how those partitions stop at the brace.
- Grids A and H: I left them unchanged, as you chose, so their 32 clashes remain. The remaining options are interior bracing at the stair/elevator core, which needs new columns, or action 2: the architect makes those Level 1 storefront bays solid.
- Engineer review: Grid 4 now has one braced frame instead of two, with longer, flatter braces. The W21X55 beams in bay D–E now take the brace point load at mid-span. This change is already synced to the team, so the structural engineer needs to check it before it goes any further. The sync comment flags that it's pending review.
The clash markers, review views and spreadsheet still show the old G04 results. Once you reload the structural link in "261116 Linking Test", I can re-run the full clash check and update them.
Claude Reruns the Clash Check
I'll re-run the full clash check against the reloaded link, then rebuild the markers and review views and update the spreadsheet. First I'll confirm the host model is seeing the new structural version.
The host is seeing the new structural model: footing tops at -0'-6" and 30 braces. Now I'll replace the old markers and views with a fresh clash run.
Nothing changed; the run rolled back. Revit won't delete the review view that's currently open on screen. I'll switch to a different view first, then re-run.
Step 1: re-ran the full clash check against the reloaded structural link. It found 1,054 clashes, down from 1,080.
- G02, footings into slab-on-grade: 0 clashes (was 32). Resolved.
- G04, braces through glazing: 34 clashes (was 64).
- 32 are on Grids A and H, which were left unchanged: storefront glass, mullions and EIFS at Level 1.
- The other 2 are the new Grid 4 D–E braces sitting inside the solid EIFS wall, which is expected.
- New, G11, columns through the slab-on-grade: 32 clashes. These are the Level 1 columns now passing through the 6" slab to reach their footings. They're expected.
- New, G12, braces vs partition ends: 4 clashes. These are the new Grid 4 braces at Levels 2 and 3 crossing the ends of the 1-hr partitions.
- All other groups are unchanged: G01 12, G03 124, G05 447, G06 22, G07 164, G08 69, G09 64, G10 82.
Markers and views: I deleted the old markers and review views and rebuilt them. There are now 1,054 markers and 12 views, including new ones for G11 and G12. There's no G02 view because that group has no clashes left. The overview view is open in Revit. Next I'll update the spreadsheet.
The spreadsheet total now matches the model at 1,054. I'll also rebuild the full clash register workbook from the new run, since the earlier one is out of date.
I re-ran the full clash check against the reloaded structural link. There are now 1,054 clashes, down from 1,080. I've also rebuilt the markers and 3D review views, and updated the spreadsheet and the clash report to match.
- G02, footings into slab-on-grade: 0 clashes (was 32). Resolved.
- G04, braces through glazing: 34 clashes (was 64).
- 32 are on Grids A and H, which have no solid bays to move the bracing into.
- 2 are the new Grid 4 braces sitting inside the solid EIFS wall, which is expected.
- New, G11, columns through the slab-on-grade: 32 clashes. These come from the G02 fix and are normal; the architect may want to show blockouts at the columns.
- New, G12, braces vs partition ends: 4 clashes. The new Grid 4 braces cross the ends of 1-hr partitions at Levels 2 and 3, and the architect needs to detail those.
- All other groups are unchanged.
In Revit: the old markers and views are replaced by 1,054 new markers and 12 review views, including ones for G11 and G12. There's no G02 view because that group has no clashes left. The overview view is open. These are new content in "261116 Linking Test", so save or sync that model to keep them.
Spreadsheet: the total now reads 1,054. The G02 and G04 rows have their new counts, and there are new rows for G11 and G12. The "Setup & Notes" tab now records both fixes and this re-run.
Two decisions are still open:
- Grids A and H bracing: the choice is between bracing at the stair/elevator core, which needs new columns, and action 2, where the architect makes the braced Level 1 storefront bays solid.
- Grid 4 bracing: the structural engineer still needs to review the new frame in bay D–E.
Files are in clash2:
- Structural_vs_Architectural_Clash_Report_2026-11-17.xlsx

Updated Clash Group G04