Why do different teams of designers and subcontractors link and share their models during the design process? 

What are the advantages of linking models?

Are there any disadvantages to linking models?

Designers and subcontractors link their models so a lot of people can be working on the project at the same time. This allows the design process to be more efficient and offers for better quality control as more people are looking at the project. The one downside could be if the project gets unorganized or hectic there could be changes that leave people confused, which is why communication is key.

What strategies can design teams use to find and avoid clashes prior to the start of construction? 

What can be done besides sharing the models digitally?

Constant communication between both teams virtually through models as well as written and oral communication via emails and meetings ensures that there will be fewer clashes. Making sure each person is on the same page through constant communication is essential to a projects success no matter the building stage.

At what point in the project development process should design coordination start? 

Is it ever too early?

Design coordination should start from Day 1 as each change both structurally or architecturally could have a massive impact on the project. I do not think it is too early to start communication on these topics.