The transformative power of BIM.
◦ Which specific thing in this course could not have been done with drawings alone?
One thing in this course that could not have been done with 2D drawings alone was the automatic clash detection in Forma. This helped expedite the identification of potential clashes between all five models and made it easier to resolve them.
◦ Which things were harder in a model than they would have been by hand?
Some things that were harder in a model than they would have been by hand including the set-up of the mechanical HVAC system and connecting the AHUs to diffusers via ducts. By hand, this would likely have been a very trivial task; however, with a BIM model, multiple errors showed up when trying to connect the ducts which required significant trouble-shooting in order to have the ducts connect to the mechanical equipment properly.
You produced roughly thirty deliverables across ten weeks.
◦ Which one taught you the most, and why?
The deliverable that taught me the most was Week 6 (structural systems). Prior to this, I didn’t realize the importance of the architectural model and how the floors were layout. Setting up the grid layouts for the structural framing, columns and joists, made me realize how important figuring out what the correct architectural layout for the building is, at it has significant impacts on the other models later during the design process. Having a good architectural model can help reduce stress and work associated with laying out the structural, mechanical, plumbing and electrical systems.
◦ Which felt like busywork at the time and turned out to matter later?
Every model in this course was a simplification.
◦ What did your model never know about your building?
Since many simplifications were made during the course, the built model didn’t fully encompass all the information required for a fully completed model. For example, only the plumbing fixtures in one of the bathrooms were modelled. The model completely omitted the plumbing required for the kitchen area, as well as the first floor retail spac
◦ At what point in a real project would those omissions become unacceptable?