Facade automations generate a pattern across a whole building in seconds.
◦ What does the automation know, and what does it not know?
The automation seems like a fantastic tool but it fails to recognize that each individual interior unit is not always the same. Therefore, any time there is not a uniform set of interior rooms then the automation tool likely won’t be helpful. However, the automation tool does understand how to equally distribute facade features across a facade as well as how to calculate window-to-wall ratios.
◦ Where did the generated pattern need overriding, and why?
The generated pattern needed overriding where I had interior walls that weren’t uniform across a whole facade. If I kept the generated pattern then I would have an interior wall splitting a window.
◦ If the automation produces something that analyses well but looks wrong, which wins?
The non-automated pattern wins because at the end of the day Forma is just a tool to help supplement your design. Just because a design analyses well doesn’t mean it will perform well for the people who inhabit it.
What drives a project team's decision about floor to floor height?
◦ From a developer's perspective?
The developer wants their building to be as profitable as possible most of the time. Therefore, they want a building that is beautiful that attracts the most people (typically greater heights), but also want a building that costs the least (typically smaller heights). In these mixed desires, the developer often has to be the decion-maker between the architect, engineer, and builder.
◦ From a designer's perspective?
The designer wants the floor height to be as conducive to the design vision as possible. Typically, architects enjoy taller spaces as they are more open and allow for more light to enter the space.
◦ From an engineer's perspective?
The engineer wants the floor height to allow for as much MEPF as needed. If there needs to be a massive HVAC system installed, then the floor height will likely be lower to accommodate all that room the unit would need.
◦ From a builder's perspective?
The builder would want a floor height that makes the building the simplest to build. Generally, a smaller floor height would mean the simplest design and most easy to construct.
Last week we chose a massing option based on site evidence. This week you had to fit a program inside it.
◦ Where did the program and the massing disagree, and which one gave way?
◦ What would have had to be true for you to change the massing instead of the program?
◦ Which of this week's program decisions will the structural engineer and the mechanical engineer assume you got right?
Total carbon can now be estimated before materials are specified.
◦ How much confidence should a team place in that number at this stage?
◦ Which decision made this week has the largest effect on it?
◦ How would you present it to a client without overstating its precision?
At some point a conceptual model has to stop being conceptual.
◦ How do you know when a proposal is resolved enough to move into Revit?
Wrong answer: When you’ve spent so much time on it that you feel compelled to stick to that proposal.
Right answer: Forma is a fantastic tool to quickly test and analyze multiple different proposals before a final design decision is made. However, there comes a point when a decision needs to be made. I think that point comes when you have ample reasons why your selected proposal is superior to most or all other explored options.
◦ What is the cost of moving too early? Of moving too late?
By moving too early, you may have missed an alternative design that could have been more conductive to your project goals. However, by moving too late, you may start to feel as though you’ve spent so much time on a certain proposal that you feel compelled to stick with it even though it may not be the best choice. Additionally, waiting too long may compromise the project’s completion.
◦ Which parts of your Forma model do you expect to survive the handoff?
I expect the L-shaped massing design to survive the handoff. However, I doubt many of the interior floor plans may survive the handoff as I fear they might not be structurally sound or line up well with the programs of the commercial space on the ground floor.