Which building information is best conveyed in 3D, and which still requires 2D?
◦ Which stakeholders need 2D drawings, and why has that not gone away?
3D modeling is necessary for spatial integration, automated clash coordination, and displaying complicated design to project owners. By contrast 2D visuals are still being used today as the official legal and technical contract documentation because they reduce complicated information into readable drawings for construction crews and code inspectors.Â
◦ Give an example of something in your building a 3D view fails to communicate.
In revit we have a 3D model of a building, but it contains no instructions on how to build it, but a 2D plan has more information on what is needed per floor.Â
The same location needs to be shown differently to different audiences.
◦ How would information at one spot be filtered for a client, a contractor, a code official and a fabricator?
Information filtered for the client is result and cost, so basically they view the end product, schedule, and how much it costs.
Information filtered for the contractors is buildability so basically measurements and locations, limits, order of operations, execution procedures, and organizing the trades.
Information filtered for the code official are safety and legality such as exiting designs, fire ratings, building use, accessibility and making sure drawings are stamped and displaying code compliance.
Information filtered for the fabricator are manufacturing accuracy such as fabrication dimensions, product specifications, assembly details, and margins of error for their particular job.
◦ What is the risk of showing everyone the same view?
The risk of showing everyone the same view is excessive documentation overburden and a coordination collapse, which causes expensive errors, setbacks, and legal risks.Â
View templates enforce consistency across a set.
◦ What goes wrong on a real project when views are configured individually?
Individual configuration eliminates the safeguards of standard templates leading to the project becoming inconsistent. Furthermore, everyone is working from a different layout which introduces errors and miscommunication.Â
◦ Who should own the templates and standards, and why?
The project manager should own the templates and standards because it makes sure there is only one correct version preventing other people from making changes, which can lead to project failure.Â