Module 6 - Points to Ponder

Submitted For
Module 6 - Points to Ponder
💡
Please share your comments on 3 of the following 5 questions.

Which structural framing systems and materials are most commonly used in the United States for residences? For office buildings?

◦  What factors explain why those dominate? In the US, houses and low-rise apartments are mostly light wood framing, and mid-rise apartments are usually wood over a concrete podium. Offices are mostly steel with a composite metal deck, with concrete more common on the West Coast. Wood wins for housing because lumber and framing crews are everywhere, it is cheap, and the code allows about five stories of it. Offices go steel because tenants want long open spans and the frame goes up fast.

◦  Why did you choose your system, and what did it cost you? I chose cast-in-place concrete: a 10 in. post-tensioned flat plate on 12 x 36 in. columns with concrete shear-wall cores. The building is 8 stories and 92 ft, so wood over a podium would have cost me floors, and Module 5 left only about 1'-2" of plenum at 11 ft floor to floor, so there was no room for beams. A flat plate keeps the ceiling where it is. It cost me weight and bigger footings, slower construction than wood, and a grid I had to split at the corridor because the unit widths on each side do not line up.

You sized members by judgment rather than analysis.

◦  What did you base your first guess on? Rules of thumb. A PT flat plate is roughly span/40 to span/45 thick, and my spans top out near 29 ft, so 10 in. The columns are 12 x 36 in. blades so they hide inside the party walls. The shear walls are 12 in., thicker than my 8 in. architectural core walls.

◦  Why is it safer to guess large and shrink than to guess small and grow? If a member shrinks later, the space it gives back is free. If it grows, it pushes into rooms, doors and ceiling height that were already designed around it, and every other discipline has to redo work. My 12 in. shear walls already ran into core doors and stair landings because the architecture was drawn around 8 in. walls.

◦  At what point in a real project does the engineer take over from the guess? Once the system and grid are set, usually late schematic design or early design development. The engineer runs the real loads and replaces the guesses with calculated sizes before the drawings go out for permit.

Design teams link and share models rather than working in one file.

◦  What are the advantages of linking?

◦  What errors does linking make possible that a single model would not?

◦  Why is getting shared coordinates right at the start so much cheaper than fixing it later?

Not every clash is a problem.

◦  On what basis did you classify a clash as an issue versus not an issue? A clash was not an issue when the overlap was intentional: columns sitting inside party and corridor walls, and the architectural floors and core walls overlapping the structural slab and shear walls that replace them. That was 1,276 clashes in Model Coordination. Anything where structure hits something that has to stay put, like windows, stairs and railings, ceilings, plumbing fixtures and doors, stayed open as an issue. That was 264 after I shortened the east windows to clear the slab.

◦  Who should have authority to close a clash on a real project? The engineer or architect responsible for that element, together with the BIM coordinator. A structural clash should not be closed by the architect alone, and it should never be closed just to bring the count down. The coordinator tracks it, and the person who owns the element signs off that it is acceptable.

Your beam depths just constrained next week's ductwork.

◦  Where in your building is the ceiling plenum now tightest?

◦  What would you give up to get it back?

◦  Should the structural engineer have consulted the mechanical engineer before setting spans?