Module 6 - Points to Ponder

Submitted For
Module 6 - Points to Ponder
💡
Please share your comments on 3 of the following 5 questions.

Which structural framing systems and materials are most commonly used in the United States for residences? For office buildings?

◦  What factors explain why those dominate?

◦  Why did you choose your system, and what did it cost you?

In the United States, wood framing is most common for residential buildings because it is affordable, readily available, and relatively easy to construct. For office buildings, steel and concrete are more common. Steel allows for longer spans and open floor plans, while concrete offers good fire resistance, durability, and acoustic performance. Steel and concrete also allow for taller structures, which is important for office buildings to maximize footprint.

For my building, I chose a concrete structural system. I ruled out the concrete-and-wood option because my design has six stories above the ground-level commercial floor, exceeding the five-story limit. Between concrete and steel, I chose concrete because most of my building is residential, where fire resistance and acoustics are important. My structural grid also creates relatively short spans of 20–25 feet, so steel's longer-span capabilities were not necessary.

The main trade-off is that concrete has a higher embodied carbon impact than wood. It is also slower to construct than steel.

You sized members by judgment rather than analysis.

◦  What did you base your first guess on?

◦  Why is it safer to guess large and shrink than to guess small and grow?

◦  At what point in a real project does the engineer take over from the guess?

For my initial member sizes, I relied on the recommendations from the course video, my personal experience as a structural engineering major, and the available member sizes in Revit. When choosing between the available options, I generally selected the larger sizes to be on the conservative side.

It is safer to start with larger members and reduce their sizes after analysis because undersized members may not meet strength or stiffness requirements. Starting too small could also require significant design changes later.Designing initially for larger members, hence leaving space, makes going smaller easier for adjustments.

In a real project, the structural engineer takes over during the design development phase to perform detailed structural analysis and verify member sizes based on actual loads, code requirements, and deflection limits.

Design teams link and share models rather than working in one file.

◦  What are the advantages of linking?

◦  What errors does linking make possible that a single model would not?

◦  Why is getting shared coordinates right at the start so much cheaper than fixing it later?

Linking models allows different design teams to work independently on their own models while still coordinating within a shared project. This makes collaboration easier, reduces the risk of one team accidentally changing another team's work, and allows updates to be incorporated without having to work in one large file.

However, linking can introduce coordination issues. Models may not align properly due to incorrect positioning or shared coordinates. Links can also become outdated if one team updates its model but others do not reload the latest version. This can lead to clashes between architectural, structural, and MEP elements going unnoticed.

Getting shared coordinates right at the beginning is important because all linked models need to align in the same location and orientation. Fixing coordinate issues later can require repositioning multiple models and rechecking existing work, which becomes increasingly time-consuming as the project develops.

Not every clash is a problem.

◦  On what basis did you classify a clash as an issue versus not an issue?

◦  Who should have authority to close a clash on a real project?

Your beam depths just constrained next week's ductwork.

◦  Where in your building is the ceiling plenum now tightest?

◦  What would you give up to get it back?

◦  Should the structural engineer have consulted the mechanical engineer before setting spans?