Your loads were determined by decisions you made weeks ago.
◦ Which single earlier decision had the largest effect?
◦ If you could go back to Week 3 knowing this, what would you change?
◦ Who on a real project team should have raised this, and when?
Occupant comfort is not the same as air temperature.
◦ What else determines whether an occupant feels comfortable?
There are several factors that impact an occupants comfort. Some examples are activity level, clothing, gender, and surface area.
◦ Which of those can your model predict, and which can it not?
The model cannot really predict any of the factors, unless those values are inputted. Typically, the model will assume those values based on what type of building it is (residential or commercial) and use an industry estimate. However, these values can be outdated and unrepresentative of real world conditions, and thus can not reflect actual occupant comfort.
The Bay Area has a mild climate.
◦ Where in your typical floor, and where else in your building, is mechanical cooling genuinely necessary?
◦ What would it take to eliminate it, and what would that cost the occupants?
You computed loads for one typical floor.
◦ Which floors in your building would have a different loads, and why?
All floors would have different loads. The largest difference in loads is likely between the first and seventh floor, as stack effect has a notable impact on loads. Stack effect drives infiltration unevenly between floors, which will impact the amount of cold/hot air entering/exiting the room, and thus the loads.
◦ Would the system you modeled for your two units still work on those floors, or what would you change?
I chose to model the 3rd floor, which is roughly the middle of the building, where the impacts of stack effect are the lowest. Thus, the lower and higher floors will require greater heating/cooling capacity than what was modelled for level 3.
You were told not to agonize over duct connections.
◦ What is the difference between a detail that matters now and one that can wait?
If the detail impacts the results of any analysis performed right now, then it is a detail that matters. For example, we ran an airflow analysis for the building this week, and that was impacted by several details, including those from the architectural model. Some details that I had glossed over in previous weeks needed to be fixed in order to have an accurate airflow analysis.
◦ How would you know you had deferred something you should not have?
I would know if I had deferred something incorrectly if those details impacted the teams that worked off of that model. Duct connections are strictly impacting mechanical systems, and thus the details can be deferred because they do not impact the work of the structural and architectural teams. However, the duct sizes do matter for ceiling design, and thus those values should be detailed.