Please share your comments on 3 of the following 5 questions.

Sanitary drainage must slope; supply piping does not.

◦  How did that single rule change your plan?

◦  Where would you locate restrooms differently if you started over?

Building science: efficient lighting and controls.

◦  Which controls strategy would most reduce your lighting energy, and why?

◦  How do your Week 3 window-to-wall ratio and your Week 4 glazing and shading choices show up in this week’s lighting load?

You modelled a representative slice rather than the whole building.

◦  What did the slice teach you that would have been buried in a full model?

Modelling one slice helped me learn the finer details of plumbing and electrical systems without it being buried within the full model. For example, I had a clash with pipe and ceiling joist that I had to make a decision on—whether to resolve the clash or leave it for now. These smaller decisions would have been lost in the full model.

◦  What might a slice hide that only a full model would reveal?

A slice can hide the issues that only show up at scale or when systems meet. For example, horizontal connections between unstacked rooms, or clashes with ducts that aren’t within the slice. One slice assumes the building repeats itself cleanly on every floor, which typically isn’t the case.

Panels, risers and mechanical rooms all compete for the same square footage.

◦  How much of your floor area is now given over to systems?

I think around 5-10% of the floor area is covered by systems. I am not particularly surprised by the percentage because of how important the systems are.

◦  Is that a failure of planning or a normal cost of a working building?

I think that the area that systems take up is a normal cost of a working building. They are required to ensure that the building functions as needed. What would count as a failure is if the systems are inaccurately set up. For example, if there are clashes between layouts that aren’t addressed before construction, these issues will create wasted and unusable spaces within the building;.

You now have five models from five notional disciplines.

◦  Who is responsible when two of them disagree?

When two models disagree, it should be the project coordinator who is responsible, which is typically the architect, unless there is a BIM coordinator. There may be some levels of hierarchy as well; structural elements usually take precedent, while electrical systems are easiest to reroute.

◦  What would go wrong if all five were one file instead?

If all models were in one file, it would be very difficult to distinguish who owns which part. It would be very easy for one person to make changes to elements that they are not in charge of, which can create chaos and dysfunctional systems. Additionally, one file with all of the information can cause slow loading times, and if anything goes wrong, everything is lost.