Sanitary drainage must slope; supply piping does not.

◦  How did that single rule change your plan?

◦  Where would you locate restrooms differently if you started over?

Building science: efficient lighting and controls.

◦  Which controls strategy would most reduce your lighting energy, and why?

◦  How do your Week 3 window-to-wall ratio and your Week 4 glazing and shading choices show up in this week’s lighting load?

You modelled a representative slice rather than the whole building.

◦  What did the slice teach you that would have been buried in a full model?

◦  What might a slice hide that only a full model would reveal?

By doing one slice, I was able to spend more time detailing a single location. I saw the fixtures in one bathroom faced three different walls, so no single wall could serve all of them. I also saw the first floor had a concrete slab and beam while the floors above had joists, which changed where the pipes could go. Since I didn’t have the full model, I couldn’t see how everything adds up. I wouldn’t have seen how everything competes for the same space. I also didn’t see the efficiency of placing restrooms next to each other.

Panels, risers and mechanical rooms all compete for the same square footage.

◦  How much of your floor area is now given over to systems?

◦  Is that a failure of planning or a normal cost of a working building?

The plumbing sits inside the walls so that doesn’t take much floor area. I didn’t see the electrical wiring’s thickness or clashes with the mechanical components. But the HVAC system takes the most floor (ceiling) space. There isn’t really any lost floor space for furniture or occupants though. It’s the normal cost of a working building, but planning helps reduce the competition.

You now have five models from five notional disciplines.

◦  Who is responsible when two of them disagree?

◦  What would go wrong if all five were one file instead?

Whoever placed their elements last are responsible for repositioning, unless it’s nearly impossible to do anything because of poor design choices from the other discipline. Typically whoever started first has done a lot of work already, so making them going back will delay project schedules a lot. If all five were one file, that would make it difficult to resolve issues or even make progress. Typically people, one at a time, work on files and then upload the latest model. If all disciplines shared one model, it would cause many delays.