Working link to your Revit cloud model in Forma Data Management.
Ian’s Revit cloud model link
Working link to your Individual Forma Board
PDF sheet set at D size, 30 by 42 inches, six sheets. Delete any blank sheets.
Screenshot of your Insight result alongside your Week 3 Forma result.

The week 3 and week 4 Forma carbon analysis insights are extremely different. The main differences are the embodied carbon kgCO2e values. For week 3, the value is about 7.3M whereas for week 4 it was only about 0.45M. The biggest factors in the 7.3M values were the roofs and interior floors. I think my week 4 roof assemblies either chose more energy efficient strategies or that Revit didn't recognize some of the roofs and interior floors.
Design memo of 300 to 400 words: what survived the handoff, what you rebuilt, what assembly choices you made and why, and where Revit and Forma disagreed.
The model handoff from Forma to Revit was not very smooth. Although Revit captured most of the design elements, the ones it missed were extremely time-consuming to fix. First, the custom curtain wall pattern on the facade facing 25th street completely disappeared causing me to have to choose an existing curtain wall pattern on Revit. This meant I had to create a new curtain wall that adhered to the building’s exterior footprint. Additionally, the interior staircases didn’t transfer over correctly leaving many handrails in the wrong places and some flights completely missing. This forced me to spent much time remodeling these directly in Revit.
Although this wasn’t too difficult., I realized I should have been more careful and thorough in my forma design before transferring the model over as adding desing choices was extremely difficult. I realized I had forgoten to design a ground floor commercial floor plan which meant I had to add interior walls that somehow would intersect with the custom forma curtain wall. This was not easy and required many suspicious “disallow joins” and accepting many “delete curtain wall mullion” warnings. Hopefully this doesn’t come back to bite me later. Additionally, adding in exterior doors on the custom curtain wall was a struggle and for one section it was impossible so I had to place the doors in a breezeway which I created to connect 25th and 24th street.
Besides the modeling struggles, I found designing the commercial floor plan fascinating as I modeling it off of 500 Stanyan Street—a deeply affordable hosuing complex in San Francisco. From the start, I designed my apartment complex from the perspective of uplifting the surrounding impoverished Oakland community and providing a safe haven for low-income residents. In order to ensure these residents can help get back on their feet, I wanted to provide them a plusher of services on the ground flor including an early education center, job training services, community space, and bike parking to ensure they can get the help they need.
For the wall assembly I divided it into the first level concrete podium and 6 stories of light gauge steel structure as the cap for Type-III wood frame was 5-story construction on a concrete podium. For the upper residential floors I decided to create a wall assembly from exterior to interior as follows: cladding (finish 1), air polyiso insulation, vapor retarder, plywood, core boundary, fiberglass steel batt insulation, core boundary, & gypsum wall board (finish 2)). I decided to use polyiso insulation as it had one of the highest R-value/inch offered for insulation. However, knowing that my structure would be steel, steel conducts heat 400x faster than wood cutting the R-value of fiberglass in half so I decided to maximize polyiso insulation. The final thermal resistance for the residential floor walls is R-39.
For the 1-story concrete podium wall insulation, I decided to create a wall assembly from exterior to interior as follows: concrete pre-cast (finish 1), air, polyiso insulation, vapor retarder, core boundary, concrete masonry, core boundary, & gypsum wall board (finish 2). Here I also used polyiso insulation but without fiberglass steel batt insulation so I maximized the polyiso insulation to a thickness of 3” which is still standard enough to be commonly manufactured. The final thermal resistance for the first-floor concrete podium walls is R-32.
There is no doubt that Forma is a powerful tool for massing and early-stage design; however, when transferring that design into Revit to make more complex modifications and additions, there are many frustrating conflicts. I spent a majority of this module simply remodeling my work into Revit which was a pain. However, I think Forma is still incredible valuable as you can run rapid analyses and test various massing models quickly to know what desing direction you wish to pursue backed by real-world evidence beyond mere aesthetic guidance.