Chandra Suda β€” Module 6

Link to Student
Submitted For
Module 6 - Load Bearing

Working links to both Arch and Stru models in Forma Data Management.

Architectural model: M04_Suda_1155Third_ShellCore.rvt

Structural model: M06_Suda_1155Third_Structure.rvt

Working link to your Individual Forma Board

Module 6: Load Bearing – Chandra Suda (3D structural model plus all seven sheets: S001, S101–S103, S201, S202, S301)

PDF sheet set of Structural Plans, 30 by 42 inches (E1 size)

M06_Suda_1155Third_Structure_Sheets_E1.pdf2 MiB

Classified clash report with counts.

First clash check: structural model against the linked architectural model, run in revit on the solid geometry of every structural element (461 elements). 1,945 clashes in total: 250 issues and 1,695 not issues.

Second check in Autodesk Model Coordination: architecture V9 against structure V5 in the coordination space β€œM06 Arch-Struct Coordination”, zero tolerance, grouped by category. Saved clash check: M06 Arch vs Struct. 1,540 clashes in total: 264 issues and 1,276 not issues.

Not issues (1,276, marked Valid interface in model Coordination): walls 685 (the columns sit inside party and corridor walls on purpose, and the architectural core walls overlap the shear walls that replace them), floors 564 (the architectural floors sit where the structural slab is), roofs 27 (same at the roof).

Issues (264, left open): stairs and railings 119 (supports 33, top rails 26, stairs 18, runs 16, handrails 12, landings 7, railings 4, vertical circulation 3), ceilings 70, windows 55 (where the core shear walls and columns hit windows), plumbing fixtures 14, furniture 5, doors 1. The 66 east-window clashes with the flat plate are gone after I shortened that window type in architecture V9. The other fixes are the same as in the Revit list below.

Issues (250)

  • 77 – Flat plate cuts into the heads of the tall east windows. Fixed: I shortened the east window type 3 in. (head 122.2 in. to 119.3 in.) in architecture V9.
  • 48 – Shear walls hit windows in the exterior wall at the cores. Fix: remove or move those windows.
  • 43 – The 12 in. shear walls encroach on stair landings and railings. Fix: thicken the core walls outward, not into the stairs.
  • 34 – Shear walls hit core and stair doors. Fix: add structural openings in the shear walls.
  • 15 – Columns hit interior partitions. Fix: adjust partitions around the columns.
  • 14 – Shear walls hit bath fixtures in the unit next to each core. Fix: shift that bathroom.
  • 10 – Columns hit windows. Fix: move windows off the column lines.
  • 6 – Columns hit furniture or a door on the ground floor and in units. Fix: rearrange.
  • 2 – Slab edge at a stair shaft needs adjusting.
  • 1 – Slab on grade needs an elevator pit.

Not issues (1,695)

  • 827 – Columns and walls pass through slabs, floor finishes, roof and ceilings (expected).
  • 245 – Shear walls overlap the architectural core and enclosure walls (the same walls modeled in both models).
  • 241 – Columns sit inside party walls and exterior walls (intended).
  • 130 – Beams sit in the slab, finish and ceiling zone (expected).
  • 117 – Slabs meet walls and railings (expected).
  • 75 – Beams bear on walls and core walls (expected).
  • 60 – Structural slabs and balconies duplicate the architectural slabs.

Worst conflict: the flat plate against the tall east windows (77 clashes). The Week 3 facade automation made those windows almost a full floor tall, and they run into the 10 in. slab. Dropping the window heads to sit under the slab is the next architectural change.

Design memo of 300 to 400 words: which system and why, where the grid fought your architecture, what you changed in the architectural model.

I kept the structure in cast-in-place concrete: a 10-inch post-tensioned flat plate on concrete columns, with concrete shear-wall cores around both stairs and the elevators. At eight stories and 92 feet, wood over a podium would cost at least two floors, and steel needs deeper floors and fireproofing. The deciding factor was the floor height. The housing floors are 11 feet floor to floor and Module 5 left only about 1'-2" of plenum, so there's no room for beams under the slab.

The apartments on the two sides of the corridor have different widths, so the party walls don't line up. The west walls are at 22, 44, 73, 102 and 131 feet along the bar, and the east walls are at 31, 44, 68, 90 and 118. Only the line at 44 feet works on both sides. A single grid would have put columns in the middle of living rooms, so I split it at the corridor. Odd-numbered lines follow the west party walls, even-numbered lines follow the east ones, and only line 5 runs all the way across. Lines B and C sit in the corridor walls.

The architecture had to change on the ground floor. The east corridor columns would have stood in the retail space, about 6 feet in front of the back-of-house wall. I moved that wall onto line C, moved the four room dividers onto the east column lines, and moved the wall between the retail and the cafe onto line 7. The retail lost about 6 feet of depth, but the columns are now inside walls.

The first clash check showed the flat plate cut into the tall east windows, so I shortened them 3 inches. The 12-inch shear walls are thicker than my 8-inch core walls, so the core doors, stair landings and one bathroom per floor next to the core need to move or get structural openings.