Module 6 Template

Link to Student
Submitted For
Module 6 - Load Bearing

Working links to both Arch and Stru models in Forma Data Management.

Architecture Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.LBQTCSyGQMaIPvN7tXRMzg&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3ADovTXPQkSzCN92TG4KaY0w&viewModel=detail&moduleId=folders

Structural Model: https://acc.autodesk.com/docs/files/projects/f33d74cd-07ad-475e-a8a8-30d6964935aa?folderUrn=urn%3Aadsk.wipprod%3Afs.folder%3Aco.LBQTCSyGQMaIPvN7tXRMzg&entityId=urn%3Aadsk.wipprod%3Adm.lineage%3AT3UpS8oxT_SMCl5iDdtsfg&viewModel=detail&moduleId=folders

Working link to your Individual Forma Board

CEE 220A Forma Boards - Fall 26 - CEE 120A_220A - Zhu - Autodesk Forma Board

PDF sheet set of Structural Plans, 30 by 42 inches (E1 size)

Module 6_Structural Model.pdf5 MiB

Classified clash report with counts.

Issue detail-202611021937.pdf599.1 KiB

Design memo of 300 to 400 words: which system and why, where the grid fought your architecture, what you changed in the architectural model.

Structural System: For my structural system, I chose a concrete flat plate/frame for the ground retail floor and light gauge steel framing system for the upper floors. A concrete slab foundation was also placed under the building to support the building loads and distribute them to the ground. Reinforced concrete is the standard for commercial building foundations due to its moisture resistance and load distribution properties. I also decided to use a concrete for the structural frame of the ground floor (columns and beams) since the high mass of concrete can act as the building’s primary anchor and provide a solid base for the upper commercial floors. For the upper floors, I used a steel structural framing system, which is the industry standards for commercial mid-rise buildings. Steel is also extremely ductile, meaning that it performs well in earthquake zones. This is especially important since the Bay Area falls in an active earthquake zone. Steel frames help absorb and dissipate earthquake energy, which is important for mid-rise and high-rise buildings.

Clashes: From the clash report, a large number of clashes were resolved as non-issues and were primarily due to the steel joists or concrete beams being located flush with the floor above. However, when laying out the grids for the concrete and steel structural frames, grid lines had to be adjusted to accommodate for the elevator and mechanical shaft rooms. Grid lines were shifted so that they fall in between the shafts on the floor plans; however, due to the thickness of the columns, there are still a couple clashes between columns and the walls of the shaft that can be resolved by either selecting a thinner column or shifting the shafts slightly. Additionally, I found through the clash report that some of the concrete and steel columns conflicted with interior furnishings that were placed in Week 5. This will be resolved by adjusting the interior layout in the architectural model around the framing components in the structural model.