Working links to both Arch and Stru models in Forma Data Management.
Working link to your Individual Forma Board
PDF sheet set of Structural Plans, 30 by 42 inches (E1 size)
Classified clash report with counts.
Classified Report - Link
Resolved Issues

Design memo of 300 to 400 words: which system and why, where the grid fought your architecture, what you changed in the architectural model.
System and why
I chose Type III light wood frame over a one-story concrete podium. The building is four stories, three of wood over one of concrete, well under the roughly five-story cap for this system, so the Week 3 height did not need to change.
Embodied carbon drove the choice. Light wood framing stores carbon and uses far less cement than a full concrete frame, which supports the project's net-zero goal. It was also the cheapest option the class offered. The concrete level gives the ground floor open space and the fire separation the wood floors need, and it acts as the transfer level that gathers the wood bearing walls onto a column grid.
Where the grid fought the architecture
Two layouts wanted to set the grid. A concrete flat plate works best with columns 20 to 30 ft apart, while the wood floors need bearing walls no more than about 18 ft apart, the practical limit for floor joists.
Because the podium slab acts as a transfer level, the concrete grid did not have to match the wood walls above, so I set it for the open commercial floor. The harder fights were upstairs. The U shape made the wood layout awkward at the two inside corners, where the wings meet and the units do not line up. The stair and elevator core also cut through the corridor bearing wall.
What I changed in the architectural model
I let the units set the structure instead of the reverse.
- Grid: the concrete grid is set for the commercial floor, with exterior lines held in 12 in. for 24 in. columns. The wood floors use their own grid, aligned to the demising and corridor walls and starting at Level 1. The podium slab transfers loads between the two.
- Walls: demising and corridor walls are now structural bearing walls stacked from Level 1 to the roof. I shifted two units at the inside corners so their walls land on a grid line.
- Core: bearing walls stop at the stair and elevator shafts, which are wrapped in concrete walls from foundation to roof, with matching floor openings at every level.
The result is a stricter unit by unit structural layout above the podium, while the commercial floor keeps its own open column grid.