Working links to both Arch and Stru models in Forma Data Management.
Arch:
Struct:
Working link to your Individual Forma Board
PDF sheet set of Structural Plans, 30 by 42 inches (E1 size)
Classified clash report with counts.

Design memo of 300 to 400 words: which system and why, where the grid fought your architecture, what you changed in the architectural model.
For my building, I chose a concrete structural system. I decided against the concrete-and-wood option because my design includes six stories above the ground-level commercial floor, which exceeds the five-story limit. Of the remaining concrete and steel options, I chose concrete primarily for its better fire resistance and acoustic performance, both of which are important for residential buildings. Although steel allows for longer spans, which can be beneficial for commercial spaces, most of my building is residential, making concrete a more suitable choice. Additionally, my structural grid is designed to keep columns out of the corridors, resulting in spans of approximately 20–25 feet. These spans are well within the capabilities of a concrete system, so the longer spans offered by steel are unnecessary. One disadvantage of this decision, however, is that concrete has a higher embodied carbon impact than the wood option.
I also had to adjust the structural grid to accommodate several elements of the architectural design. Rather than maintaining perfectly uniform spacing, I shifted certain gridlines to avoid conflicts with vertical shafts, stairwells, elevators, and other building elements. I also removed beams where they would otherwise cross these areas and increased the sizes of neighboring beams to account for the change in load distribution.
Through clash detection, I identified three main coordination issues. First, some columns and beams conflicted with window locations, requiring windows to be relocated or resized. Second, the original ceiling heights were insufficient to accommodate the beam depths, particularly when accounting for additional MEP systems. This would require lowering the ceilings to provide adequate space. Finally, some column locations conflicted with the furniture layouts in the example rooms, meaning the furniture arrangements would need to be revised. These issues highlighted the importance of coordinating the structural, architectural, and MEP systems early in the design process.